Winter Special Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

WELL WELL-AP WELL Accredited Professional (WELL AP) Exam Exam Practice Test

Demo: 61 questions
Total 204 questions

WELL Accredited Professional (WELL AP) Exam Questions and Answers

Question 1

During an initial kick-off meeting for a project pursuing WELL Certification, the team set a goal of supporting employee mental health by reducing work-associated stress and burnout while improving mood and sleep quality. Which of the following strategies could also contribute toward points in the Mind concept?

Options:

A.

Coordinate after work happy hours for which staff purchase their own tickets

B.

Offer meditation interventions at a 50% discount to both part-time and full-time staff

C.

Implement a policy stating that all staff are entitled to 15-minute breaks throughout the workday

D.

Send regular emails to staff featuring wellness topics like healthy eating and smoking cessation

Question 2

An office building is at the design stage. The client has the goal of achieving acceptable thermal environment for building occupants. Which of the following strategies should the WELL AP suggest to address this goal and meet the requirements of a WELL feature?

Options:

A.

Utilize natural conditioning when the prevailing mean outdoor temperature is 48°F (9C)

B.

Design a radiant ceiling, wall or floor heating/cooling system for at least 45% of the regularly occupied project area

C.

Include real-time displays of dry-bulb temperature and relative humidity for 50% of regularly occupied spaces and make available to occupants through display screens

D.

Design mechanically conditioned regularly occupied spaces to meet predicted mean value range of +/- 0.5 for at least 90% of occupied hours and regularly occupled spaces

Question 3

A project's interior designer is designing a room that will act as a restorative space for future employees to break from work and relax. The space will be at least 75 ft2 (7 m2) plus 1 ft2 (0.1 m2) per regular occupant. It will also include features like dimmable lighting, sound masking and calming colors. What additional element(s) should the interior designer incorporate to contribute towards meeting the requirements of the respective WELL optimization?

Options:

A.

A mindfulness training course by a qualified instructor

B.

A room-booking system for staff to reserve time to use the room

C.

Activity accessories, such as yoga mats, weights or exercise balls

D.

Signage or education materials explaining the intended use of the space

Question 4

Which of the following is an effective measure for a new construction project to reduce noise from nearby traffic?

Options:

A.

Alter the room geometry and space layouts

B.

Provide speech reinforcement and public address systems

C.

Suggest lightweight floor constructions below noise generating spaces

D.

Recommend high STC or Rw performance values for the building facade, windows and any exterior penetrations

Question 5

A building operations staff and a WELL AP are developing a cleaning plan for a new office building. What is the best strategy to minimize environmental damage from the cleaning process?

Options:

A.

Increase the building's ventilation rate

B.

Use HEPA rated filters on vacuum cleaners

C.

Provide regular training to relevant personnel

D.

Using products labeled as low-hazard or safer by a qualified third party

Question 6

A team is developing a health-oriented mission statement. Which of the following should be included to comply with Feature C02: Integrative Process?

Options:

A.

Ensure access to a local food market

B.

Evaluate potential impacts of relevant hazards and identify high-risk hazards

C.

Highlight stories from regular occupants who exemplify the project's health culture

D.

Incorporate relevant project goals or strategies that were established during the stakeholder charrette

Question 7

To contribute to Feature A11: Source Separation, which of the following rooms is most likely to require exhaust fans such that the return air is vented outdoors and not recirculated?

Options:

A.

Copy rooms

B.

Activity room

C.

Lactation room

D.

Conference rooms

Question 8

In one part of a university building the following rooms are all adjacent in a row and connected to the same corridor study room, classroom, classroom, recreation room, meditation room, classroom Which of the following rooms are most likely to require reprogramming or strategies for mitigating sound transmission?

Options:

A.

The two adjacent classrooms

B.

The study room and the corridor

C.

The recreation room and the meditation room

D.

The recreation room and the classroom that is adjacent to it

Question 9

Which of the following most affects respiratory health?

Options:

A.

Polychlorinated biphenyls (PCBs)

B.

Volatile organic compounds (VOCs)

C.

Chromated copper arsenates (CCAs)

D.

Perfluorinated alkyl compounds (PFCs)

Question 10

What is a key factor in promoting proper hydration?

Options:

A.

Verify 100% of all coffee dispensers are linked to clean drinking water

B.

Ensure at least 50% of water fountains report the number of plastic bottles saved

C.

Communicate about the importance of drinking 1 gal (3.79 l) of water every day

D.

Provide at least one drinking water dispenser within 100 ft. (30 m) of regularly occupied space

Question 11

Which strategy could a project pursue to meet requirements in a precondition in the Mind concept?

Options:

A.

Provide free clinical screenings

B.

Provide ongoing volunteer opportunities

C.

Provide free mindfulness programming. including in-person yoga or virtual meditation classes

D.

Provide educational material regarding healthy nutrition, including recipes and cooking methods

Question 12

Which of the following ingredients is restricted in building products such as ceilings, wall panels, insulation products, furniture and millwork in Feature: X05 Enhanced Material Restrictions?

Options:

A.

Formaldehyde

B.

Carbon monoxide

C.

Halogenated name retardants (MFR)

D.

Total volatile organic compounds (TVOCs)

Question 13

In Feature S01: Sound Mapping, Part 1: Label Acoustic Zones, which of the following zones needs to be labelled in the annotated document submission?

Options:

A.

Entry zone

B.

Mixed zone

C.

Exterior zone

D.

Amenity zone

Question 14

Which concept contains a feature designed to provide a written guide to building occupants to promote a deeper understanding of WELL features?

Options:

A.

Light

B.

Movement

C.

Community

D.

Thermal Comfort

Question 15

A project in a defined WELL Portfolio achieved all 24 preconditions and 60 points through optimizations. How many total points can this project contribute toward the WELL Portfolio Score?

Options:

A.

24 points

B.

42 points

C.

60 points

D.

84 points

Question 16

A small percentage of building occupants report chronic thermal discomfort. What strategy should be used to address this problem?

Options:

A.

Install ceiling fans

B.

Reduce relative humidity

C.

Lock thermostat setpoints

D.

Offer personal heating/cooling devices

Question 17

A WELL AP is developing a project's waste management plan. Which of the following is the best strategy lot managing the cleaning of spills of mercury, pesticides and battery acid?

Options:

A.

Label storage containers property

B.

Contain ail residue in a sealed container

C.

Arrange for annual removal of all containers

D.

Assign inventory storage locations for containers

Question 18

As a part of a new initiative of a hospital, the program leader is targeting Feature C11: Civic Engagement. Which of the following policies should be implemented to support this endeavor?

Options:

A.

Coordinate a volunteer opportunity once a year

B.

Provide eight hours of paid time for community involvement annually

C.

Contribute annually to a registered charity program to match employee donations

D.

Plan a pre-paid workshop event to educate the community on health and well-being

Question 19

A residential building has a small atrium. Which of the following should the WELL AP recommend to contribute toward Feature M07: Restorative Spaces?

Options:

A.

Table tennis table

B.

Fresh fruit options

C.

Filtered water dispenser

D.

Moveable seating arrangements

Question 20

indoor air tests for a project show high levels of carbon monoxide and nitrogen dioxide. This indicates the presence of which of the following"?

Options:

A.

Off-gassing

B.

Chemical solvents

C.

Legionella bacteria

D.

Combustion sources

Question 21

Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?

Options:

A.

Weekly

B.

Monthly

C.

Quarterly

D.

Annually

Question 22

A WELL project for a first recertification elects to be reviewed under the version for which it achieved initial certification. Under which of the following will the project be reviewed for subsequent recertifications?

Options:

A.

Same version as initial certification

B.

Version in place at the time of performance verification

C.

Version released at the time of project's first recertification

D.

Version in place 12 months prior to expiration of project's certification

Question 23

A WELL AP is advising a project team about the benefits and tradeoffs of installing operable windows on a new office building Feature A07 Operable Windows addresses the need to alert building occupants when outdoor air temperature or air quality compromises the health benefits associated with opening the windows.

Which of the following features addresses another hearth concern originating outside the building that, if not properly managed, could be exacerbated by operable window?

Options:

A.

Feature X06: VOC Restrictions

B.

Feature A11: Source Separation

C.

Feature S02: Maximum Noise Levels

D.

Feature L05: Daylight Design Strategies

Question 24

According to Feature C01: Health and Wellness Promotion. Provide WELL Feature Guide, how frequently should a building manager send communications about health resources, programs, amenities and policies available to regular occupants?

Options:

A.

Every three months

B.

Every six months

C.

Every nine months

D.

Every 12 months

Question 25

Which of the following steps can be most effective in reducing antibiotics and pesticides in food?

Options:

A.

Limit red or processed meat items on the menu

B.

Offer main dish options that do not contain gluten

C.

Source at least 50% certified organic fruits and vegetables

D.

Provide heat resistant plastic plates, bowls, cups and utensils

Question 26

Based on the WELL Building Standard™, what is a possible contributing factor to Type 2 diabetes?

Options:

A.

High consumption of seafood

B.

Low fruit and vegetable intake

C.

High consumption of caffeinated beverages

D.

Low consumption of sugar sweetened beverages

Question 27

A permanently installed an conditioner was used during construction What should be done to this equipment prior to occupancy?

Options:

A.

Tighten the fan bolt

B.

Replace me air finer

C.

Clean the condenser coil

D.

Recharge the refrigerant circuit

Question 28

Supplemental light fixtures are provided to occupants upon request at no cost within a WELL building. This benefit will enhance occupant comfort by

Options:

A.

providing visual diversity

B.

improving correlated color temperature

C.

keeping lighting uniformity in the space

D.

increasing the light level on the task surface

Question 29

A WELL AP is working on a renovation project in an existing building that is suspected to contain lead paint.

To confirm that the paint contains lead, the WELL AP requests in-situ testing. Which one of the following types of tests is acceptable to confirm the lead hazard?

  • X-ray fluorescence (XRF)

  • Polarized light microscopy (PLM)

  • Transmission electron microscopy (TEM)

Options:

A.

NIOSH Manual of Analytical Methods (MNAM) Method 7400

Question 30

A design team is considering the WELL Building Standard™ to increase access to fresh, local and seasonal fruits and vegetables by reducing environmental barriers. Which of the following can also fulfill a WELL feature?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 31

According to the WELL Building Standard™, approximately what percentage of the global adult population fails to achieve activity guidelines and is considered physically inactive?

Options:

A.

3%

B.

13%

C.

23%

D.

33%

Question 32

An open office has an overhead T8 Fluorescent lighting system. To comply with Feature L04 Electric Lighting Glare Control, what is the maximum luminance for light omitted more than 45 degrees from nadir and below the horizontal plane?

Options:

A.

6, 000 cd/m2

B.

60,000 cd/m2

C.

600,000 cd/m2

D.

No limit for luminance at those angles

Question 33

Which of the following ergonomic design strategies would a project team implement to achieve Part 1: Support Visual Ergonomics of Feature V02: Ergonomic Workstation Design?

Options:

A.

50% of workstations are height-adjustable

B.

100% of workstations include an adjustable monitor

C.

3% of employees are able to reserve a treadmill desk

D.

75% of workstation seating can be adjusted by the user

Question 34

A team is seeking to satisfy Feature A01: Air Quality, Part 2: Meet Thresholds for Organic Gases through VOC monitoring for a 87.50O ft2 (8 120 m2) project What is the minimum number of volatile organic compound (VOC) sensors that the project owner must install?

Options:

A.

10 VOC sensors

B.

15 VOC sensors

C.

20 VOC censors

D.

25 VOC sensors

Question 35

Which of the following can help a real estate investor select a site with access to local mass transit to comply with the WELL Building Standard™ (WELL™)?

Options:

A.

The building is located in an area with a minimum Walk Score® of 60

B.

The building is located in an area (zip or postal code) with a minimum Transit Score® of 50

C.

The building is located within 650 ft. (200 m) walking distance of an existing bus network that provides at least 72 weekday trips and 20 weekend trips

D.

The building is located within 0.25 mi. (0.40 km) walking distance of an existing light rail station that provides at least 72 weekday trips and 30 weekend trips

Question 36

Which of the following design strategies implemented in the meeting rooms would help the protect achieve Feature S04: Reverberation Time?

Options:

A.

An accent stone wall

B.

A floor-to ceiling glass wall

C.

An accent wall with felt pieces

D.

A painted plasterboard.drywall ceiling and wall

Question 37

The food service manager for a corporate headquarters office building is asked to explore alternative sources of food that would meet the requirements of the WELL Building Standard™ (WELL™). What recommendation should the WELL AP make that would help the manager meet WELL™ requirements?

Options:

A.

Ensure that at least 20% of products are certified organic

B.

Ensure that at least 50% of products are certified organic

C.

Ensure that at least 20% of products are from a Certified Humane® farm

D.

Ensure that at least 50% of products comes from a WELL Building Certified farm

Question 38

An employer will be leasing a new building that has one central space for a cafeteria. Which of the following conditions should the employer look for in order to comply with Feature N08: Mindful Eating?

Options:

A.

Cup volume is 8 fl oz (240 ml)

B.

Menu design includes promotion of fruits and vegetables

C.

Foods and beverages provided are labeled for common food allergens

D.

Tables and chairs to accommodate at least 25% of regular occupants at peak occupancy

Question 39

Which of the following filters can assist with the removal of organic chemicals from water intended for human consumption?

Options:

A.

Carbon

B.

HEPA.

C.

MERV

D.

Sediment

Question 40

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Furniture is acquired for 45 employees what is the minimum number of manual or electric height -adjustable work surfaces needed to meet Feature V02: Ergonomic Workstation Design. Part 2 Provide Height-Adjustable Work Surfaces?

Options:

A.

10 height-adjustable work surfaces

B.

11 height-adjustable work surfaces

C.

12 height-adjustable work surfaces

D.

13 height adjustable work surfaces

Question 41

A project team performed quarterly water testing and determined that the total dissolved solids (TDS) is above the 500 mg/L threshold. Which of the following steps should the project team take to address this issue?

Options:

A.

Remediate and retest within one month

B.

Increase the number of sample points and retest

C.

Provide additional tests from highest and lowest floors

D.

Pretest one month before next performance verification

Question 42

Which of the following hazardous materials have been restricted for use in paints in many countries?

Options:

A.

Volatile organic compounds (VOCs) and lead

B.

Cadmium and polychlorinated biphenyls (PCB)

C.

Orthophthalates and per- and polyfluoroalkyl substances (PFASs)

D.

Halogenated flame retardants (HFRs) and perfluorinated alkyl compounds (PFCs)

Question 43

A WELL v2™ project received their performance verification test results back and found that their water exceeded the allowed threshold of microorganisms. Which strategy should the WELL AP take to help the project continue pursuing certification?

Options:

A.

Apply for a different feature in the Water concept

B.

Undertake curative action and schedule retesting with a WELL Performance Testing Organization

C.

Identify a solution to the water issue and reach out for WELL coaching support to explain the new development

D.

Ask the building's facilities team to conduct water sampling and submit passing test results through the WELL digital platform

Question 44

A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied. Which step should the project team take first to address the developer's goal?

Options:

A.

Apply for the certificate of occupancy (CO)

B.

Determine the schedule for the tenants finish-out and move-in

C.

Inform the developer that performance verification requires at least 50% occupancy

D.

Schedule performance verification since all pre-verification requirements are

Question 45

Thermal Comfort is known to impact which of the following

Options:

A.

Productivity

B.

Chionic stress

C.

immune system

D.

Cardiovascular system

Question 46

A design for a WELL building has an entryway system composed of grilles that measure the width of the entrance and 10 ft. (3 m) long in the primary direction of travel. This design can meet healthy entryways by

Options:

A.

including healthy signage at the entrance

B.

incorporating revolving doors at the entrance

C.

including effective mechanical ventilation at the entrance

D.

separating common outdoor areas from building entrances

Question 47

Which of the following describes the purpose of an alternative adherence path (AAP)?

Options:

A.

To provide a different solution to meet a feature intent

B.

To enable substitution of a precondition for an optimisation

C.

To apply for a change of points threshold for a certification level

D.

To increase the maximum allowable points available for a given feature

Question 48

The annual average particulate matter (PM2.5) outside of an office is 30 ug/m*. Which of the following indoor test results meets the requirements of Feature A01: Air Quality?

A)

B)

C)

D)

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Question 49

Along with turbidity, which parameter requires a performance test in bathroom faucets?

Options:

A.

Mercury

B.

Benzene

C.

Coliforms

D.

Trihalomethane

Question 50

An operations manager intends to support employees' well-being by providing opportunities for recovery and

restoration. Which of the following options must be offered to support healthy working hours for all employees?

  • Employees are allotted a minimum of 24 consecutive hours off from work per seven-day period

  • Employees engaged in shift work are provided a minimum of 24 hours advance notice of shift changes

  • Employees are provided a break room where they can take at least one rest break or at least 30 minutes during the workday

Options:

A.

Employees have unlimited access to at least one acoustically and visually separated environment located in a designated quiet zone

Question 51

A new employee indicates to the human resources department of a project undergoing WELL Certification that they have a peanut allergy. Due to their role, the employee is required to attend catered meetings within the office for prospective clients. The project is trying to update their catering policy to accommodate the employee's health condition. Which of the following strategies should the WELL AP suggest to meet Feature N09 Special Diets?

Options:

A.

Disallow any catered meals within the office

B.

Disallow nut-based products for all employees

C.

Require that the employees with food allergies place their own catering order

D.

Ensure that catered meals include signage indicating any common food allergens

Question 52

A client would like to gather thermal comfort data at her office building. According to Feature T06: Thermal Comfort Monitoring, Part 1: Monitor Thermal Environment, which of the following strategies should the WELL AP recommend?

Options:

A.

Provide individual control over thermostats

B.

Install CO2 sensors in regularly occupied areas

C.

Monitor dry-bulb temperature and relative humidity

D.

Record mean radiant temperature and air movement

Question 53

A WELL AP offers design guidance to support active occupants and visitors of a university project with a Bike Score® of 50. There will be approximately 100 peak visitors and 1.500 regular occupants in the building The WELL AP should advise that the university project provide

Options:

A.

a bike storage room with a storage capacity of 40 bikes that is located within the protect boundary

B.

a bike storage room with a storage capacity of 80 bikes that is located within the project boundary

C.

four public bike racks located within 200 ft. (60 m) of walking distance from the building's main entrance

D.

three public bike racks located within 100 ft. (30 m) of walking distance from the building's main entrance

Question 54

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Which design element would need to be included to meet the requirements of Feature L05 Daylight Design Strategies. Part 2: Integrate Solar Shading?

Options:

A.

Task lighting at all workstations

B.

Manual screens/blinds controlled by occupants

C.

An illuminance ratio of at least 0.4 or 1:2.

D.

Target illuminance of fc (300 lux) for >50% of the unit area

Question 55

A project team conducts a daylight simulation for an office building and the result is slightly lower than the daylight simulation requirement of sDA300,50%. The window locations can no longer be changed. Which of the following strategies can be pursued to help meet the daylight simulation requirement?

Options:

A.

Arrange for automated window shades to prevent glare

B.

Change the occupancy settings in the simulation software

C.

Specify window glazing with higher Visible Transmittance (Tvis)

D.

Replace workstations along the south facade with conference rooms

Question 56

A new building project is to be located near a very busy road. Which of the following strategies should the WELL AP recommend at an early stage to minimize acoustic disturbance?

Options:

A.

Noise levels from mechanical systems should be higher than external noise breaking in from outside

B.

There should be careful detailing of internal partition junctions where noise flanking between spaces can be an issue

C.

Personal headphones should be made available to all staff during peak hours of the day when the road traffic noise outside is at its highest

D.

Noise sensitive rooms should be located in the middle of the floor plate or along a facade that is physically shielded from external noise sources

Question 57

A WELL AP is creating a pest management plan based upon integrated pest management (IPM) principles. What is the most effective strategy to minimize the use of pesticides?

Options:

A.

Record pest monitoring data and pest events

B.

Create protocols to prevent the attraction of pests

C.

Ensure all active substances are catalogued as low risk

D.

Provide notifications to all building occupants on the protocol (or pest treatments

Question 58

To reduce sound transmission between adjacent spaces, construction plans should specify

Options:

A.

interior partition walls with cutouts

B.

alignment of all gypsum board seams

C.

non-hollow core doors for private offices and conference rooms

D.

wall construction with noise isolation class (NIC) of 35 in all spaces

Question 59

Which type of artificial light can improve people's perception of a space?

Options:

A.

Electric lights that display signs of flicker

B.

Electric lights with low color rendering index (CRI)

C.

Electric lights with high color rendering index (CRI)

D.

Electric lights that have a temperature lower than 2,700K

Question 60

A food services company is trying to meet the health goals of the building owner by providing access to healthy foods, including fruits and vegetables. Which of the following strategies would support Feature N01: Fruits and Vegetables?

Options:

A.

Fruits displayed at the cash register

B.

A salad bar located in the middle of the café

C.

At least one vegetable offered on a daily basis

D.

At least 25% of available options are fruit and/or non-fried vegetables

Question 61

A WELL Cote building project wishes to challenge the findings of a WELL report. Which of the following steps should the protect team take?

Options:

A.

Submit an appeal

B.

Submit for equivalency

C.

Submit for recertification

D.

Submit a curative action plan

Demo: 61 questions
Total 204 questions