During an initial kick-off meeting for a project pursuing WELL Certification, the team set a goal of supporting employee mental health by reducing work-associated stress and burnout while improving mood and sleep quality. Which of the following strategies could also contribute toward points in the Mind concept?
An office building is at the design stage. The client has the goal of achieving acceptable thermal environment for building occupants. Which of the following strategies should the WELL AP suggest to address this goal and meet the requirements of a WELL feature?
A project's interior designer is designing a room that will act as a restorative space for future employees to break from work and relax. The space will be at least 75 ft2 (7 m2) plus 1 ft2 (0.1 m2) per regular occupant. It will also include features like dimmable lighting, sound masking and calming colors. What additional element(s) should the interior designer incorporate to contribute towards meeting the requirements of the respective WELL optimization?
Which of the following is an effective measure for a new construction project to reduce noise from nearby traffic?
A building operations staff and a WELL AP are developing a cleaning plan for a new office building. What is the best strategy to minimize environmental damage from the cleaning process?
A team is developing a health-oriented mission statement. Which of the following should be included to comply with Feature C02: Integrative Process?
To contribute to Feature A11: Source Separation, which of the following rooms is most likely to require exhaust fans such that the return air is vented outdoors and not recirculated?
In one part of a university building the following rooms are all adjacent in a row and connected to the same corridor study room, classroom, classroom, recreation room, meditation room, classroom Which of the following rooms are most likely to require reprogramming or strategies for mitigating sound transmission?
Which of the following most affects respiratory health?
What is a key factor in promoting proper hydration?
Which strategy could a project pursue to meet requirements in a precondition in the Mind concept?
Which of the following ingredients is restricted in building products such as ceilings, wall panels, insulation products, furniture and millwork in Feature: X05 Enhanced Material Restrictions?
In Feature S01: Sound Mapping, Part 1: Label Acoustic Zones, which of the following zones needs to be labelled in the annotated document submission?
Which concept contains a feature designed to provide a written guide to building occupants to promote a deeper understanding of WELL features?
A project in a defined WELL Portfolio achieved all 24 preconditions and 60 points through optimizations. How many total points can this project contribute toward the WELL Portfolio Score?
A small percentage of building occupants report chronic thermal discomfort. What strategy should be used to address this problem?
A WELL AP is developing a project's waste management plan. Which of the following is the best strategy lot managing the cleaning of spills of mercury, pesticides and battery acid?
As a part of a new initiative of a hospital, the program leader is targeting Feature C11: Civic Engagement. Which of the following policies should be implemented to support this endeavor?
A residential building has a small atrium. Which of the following should the WELL AP recommend to contribute toward Feature M07: Restorative Spaces?
indoor air tests for a project show high levels of carbon monoxide and nitrogen dioxide. This indicates the presence of which of the following"?
Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?
A WELL project for a first recertification elects to be reviewed under the version for which it achieved initial certification. Under which of the following will the project be reviewed for subsequent recertifications?
A WELL AP is advising a project team about the benefits and tradeoffs of installing operable windows on a new office building Feature A07 Operable Windows addresses the need to alert building occupants when outdoor air temperature or air quality compromises the health benefits associated with opening the windows.
Which of the following features addresses another hearth concern originating outside the building that, if not properly managed, could be exacerbated by operable window?
According to Feature C01: Health and Wellness Promotion. Provide WELL Feature Guide, how frequently should a building manager send communications about health resources, programs, amenities and policies available to regular occupants?
Which of the following steps can be most effective in reducing antibiotics and pesticides in food?
Based on the WELL Building Standard™, what is a possible contributing factor to Type 2 diabetes?
A permanently installed an conditioner was used during construction What should be done to this equipment prior to occupancy?
Supplemental light fixtures are provided to occupants upon request at no cost within a WELL building. This benefit will enhance occupant comfort by
A WELL AP is working on a renovation project in an existing building that is suspected to contain lead paint.
To confirm that the paint contains lead, the WELL AP requests in-situ testing. Which one of the following types of tests is acceptable to confirm the lead hazard?
A design team is considering the WELL Building Standard™ to increase access to fresh, local and seasonal fruits and vegetables by reducing environmental barriers. Which of the following can also fulfill a WELL feature?
A)
B)
C)
D)
According to the WELL Building Standard™, approximately what percentage of the global adult population fails to achieve activity guidelines and is considered physically inactive?
An open office has an overhead T8 Fluorescent lighting system. To comply with Feature L04 Electric Lighting Glare Control, what is the maximum luminance for light omitted more than 45 degrees from nadir and below the horizontal plane?
Which of the following ergonomic design strategies would a project team implement to achieve Part 1: Support Visual Ergonomics of Feature V02: Ergonomic Workstation Design?
A team is seeking to satisfy Feature A01: Air Quality, Part 2: Meet Thresholds for Organic Gases through VOC monitoring for a 87.50O ft2 (8 120 m2) project What is the minimum number of volatile organic compound (VOC) sensors that the project owner must install?
Which of the following can help a real estate investor select a site with access to local mass transit to comply with the WELL Building Standard™ (WELL™)?
Which of the following design strategies implemented in the meeting rooms would help the protect achieve Feature S04: Reverberation Time?
The food service manager for a corporate headquarters office building is asked to explore alternative sources of food that would meet the requirements of the WELL Building Standard™ (WELL™). What recommendation should the WELL AP make that would help the manager meet WELL™ requirements?
An employer will be leasing a new building that has one central space for a cafeteria. Which of the following conditions should the employer look for in order to comply with Feature N08: Mindful Eating?
Which of the following filters can assist with the removal of organic chemicals from water intended for human consumption?
Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their
primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its
employee benefits and organizational policies. As an example, they offer a 50% discount on several
mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Furniture is acquired for 45 employees what is the minimum number of manual or electric height -adjustable work surfaces needed to meet Feature V02: Ergonomic Workstation Design. Part 2 Provide Height-Adjustable Work Surfaces?
A project team performed quarterly water testing and determined that the total dissolved solids (TDS) is above the 500 mg/L threshold. Which of the following steps should the project team take to address this issue?
Which of the following hazardous materials have been restricted for use in paints in many countries?
A WELL v2™ project received their performance verification test results back and found that their water exceeded the allowed threshold of microorganisms. Which strategy should the WELL AP take to help the project continue pursuing certification?
A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied. Which step should the project team take first to address the developer's goal?
Thermal Comfort is known to impact which of the following
A design for a WELL building has an entryway system composed of grilles that measure the width of the entrance and 10 ft. (3 m) long in the primary direction of travel. This design can meet healthy entryways by
Which of the following describes the purpose of an alternative adherence path (AAP)?
The annual average particulate matter (PM2.5) outside of an office is 30 ug/m*. Which of the following indoor test results meets the requirements of Feature A01: Air Quality?
A)
B)
C)
D)
Along with turbidity, which parameter requires a performance test in bathroom faucets?
An operations manager intends to support employees' well-being by providing opportunities for recovery and
restoration. Which of the following options must be offered to support healthy working hours for all employees?
A new employee indicates to the human resources department of a project undergoing WELL Certification that they have a peanut allergy. Due to their role, the employee is required to attend catered meetings within the office for prospective clients. The project is trying to update their catering policy to accommodate the employee's health condition. Which of the following strategies should the WELL AP suggest to meet Feature N09 Special Diets?
A client would like to gather thermal comfort data at her office building. According to Feature T06: Thermal Comfort Monitoring, Part 1: Monitor Thermal Environment, which of the following strategies should the WELL AP recommend?
A WELL AP offers design guidance to support active occupants and visitors of a university project with a Bike Score® of 50. There will be approximately 100 peak visitors and 1.500 regular occupants in the building The WELL AP should advise that the university project provide
Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their
primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its
employee benefits and organizational policies. As an example, they offer a 50% discount on several
mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Which design element would need to be included to meet the requirements of Feature L05 Daylight Design Strategies. Part 2: Integrate Solar Shading?
A project team conducts a daylight simulation for an office building and the result is slightly lower than the daylight simulation requirement of sDA300,50%. The window locations can no longer be changed. Which of the following strategies can be pursued to help meet the daylight simulation requirement?
A new building project is to be located near a very busy road. Which of the following strategies should the WELL AP recommend at an early stage to minimize acoustic disturbance?
A WELL AP is creating a pest management plan based upon integrated pest management (IPM) principles. What is the most effective strategy to minimize the use of pesticides?
To reduce sound transmission between adjacent spaces, construction plans should specify
Which type of artificial light can improve people's perception of a space?
A food services company is trying to meet the health goals of the building owner by providing access to healthy foods, including fruits and vegetables. Which of the following strategies would support Feature N01: Fruits and Vegetables?
A WELL Cote building project wishes to challenge the findings of a WELL report. Which of the following steps should the protect team take?