New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

Scrum SAFe-SASM SAFe Advanced Scrum Master (SASM) Exam Practice Test

Demo: 18 questions
Total 60 questions

SAFe Advanced Scrum Master (SASM) Questions and Answers

Question 1

Why are phase-gate Milestones problematic?

Options:

A.

They prohibit decision-making at the Large-Solution level

B.

They only allow integration on PI boundaries

C.

They use documentation as a proxy for Solution progress

D.

They fix designs too late in the process

Question 2

What are two characteristics of teams that fear conflict? (Choose two.)

Options:

A.

They avoid pair work

B.

They ignore controversial topics that are critical to team success

C.

They fail to tap into all the opinions and perspectives of team members

D.

They have longer meetings

E.

They do not focus on results

Question 3

Inspect and Adapt events occur at which two SAFe levels? (Choose two.)

Options:

A.

Portfolio Level

B.

Essential Level

C.

Team Level

D.

Value Stream Level

Question 4

What are three opportunities for creating collaboration on a team? (Choose three.)

Options:

A.

Pair work

B.

Iteration planning

C.

Communities of Practice

D.

Inspect and Adapt

E.

Hackathons

F.

Backlogrefinement

Question 5

Lee is a developer on the team. At every daily stand-up Lee reports, "Yesterday, I worked on indexing. Today, I will work on indexing. I have no impediments." What coaching should the Scrum Master provide Lee to improve the team's visibility into his work?

Options:

A.

Ask the team to break Lee's Stories into tasks for better understanding

B.

Assign another team member to assist Lee with indexing and ask Lee to start a different piece of work

C.

Tell Lee to pair with another team member

D.

Have Lee discuss his progress in the context of the Iteration goals

Question 6

An Agile Team decides they want to use pair programming in future Iterations. Where should this be captured?

Options:

A.

In the Inspect and Adapt meeting notes

B.

In the team retrospective notes

C.

In the Program Backlog

D.

In the team's improvement backlog

Question 7

What is one problem with phase-gate Milestones?

Options:

A.

They assume a point Solution exists and can be built right the first time

B.

They force design decisions too late in the process

C.

They account for variability inherent in the process

D.

They require the Product Owner to act as gatekeeper or guardian of the process

Question 8

What are two timestamps required to measure lead time when using a Team Kanban board? (Choose two.)

Options:

A.

When the Story is released to users and validated

B.

When the Story is deployed

C.

When the Agile Team pulls a Story onto the board

D.

When the Story is accepted by the Product Owner

E.

When the team completes validation of the Story

Question 9

What is one way a Scrum Master can gain the confidence of a stakeholder?

Options:

A.

Establish a daily sync meeting with the stakeholder

B.

Invite the stakeholder to the Iteration retrospective

C.

Make sure the results of the retrospectives are made public

D.

Make the process visible

Question 10

Which two events provide opportunities for the team to collaborate? (Choose two.)

Options:

A.

Iteration Planning

B.

Portfolio Sync

C.

Solution Demo

D.

Pre-PI Planning

E.

Backlog refinement

Question 11

What should be the first step a team should take to feed potential problems into the Problem Solving workshop?

Options:

A.

Identify enablers needed to build out the Architectural Runway

B.

Conduct a short team retrospective

C.

Review feedback from the System Demo

D.

Analyze quantitative & qualitative metrics

Question 12

The purpose of Continuous Integration is to deliver what?

Options:

A.

Potentially deployable code

B.

New builds on the test environment

C.

Smaller batch sizes

D.

Specific customer functionality

Question 13

What ROAM risk management category requires a plan for eliminating the threat of the risk?

Options:

A.

Owned

B.

Accepted

C.

Mitigated

D.

Resolved

Question 14

Which statement is true about large Stories?

Options:

A.

They make it difficult to apply iterative development

B.

They require additional refinement sessions to fully understand the scope

C.

They fit into one Iteration

D.

They should be split into multiple tasks

Question 15

What is one way a Scrum Master leads the team's efforts for relentless improvement?

Options:

A.

By helping teams become better problem solvers

B.

By scheduling team meetings

C.

By building a high-performing team

D.

By focusing on technical discipline

Question 16

Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)

Options:

A.

Business Owners

B.

Release Train Engineer

C.

Systems Team

D.

Product Owner

E.

Epic Owner

Question 17

If a team insists that big Stories cannot be split into smaller ones, how would the Scrum Master coach them to do otherwise?

Options:

A.

Emphasize the SAFe principles to highlight the importance of flow

B.

Suggest a story-splittingbootcamp in the next IP iteration

C.

Demonstrate Story-splitting techniques using a specific example

D.

Invite a development manager to emphasize the importance of splitting Stories

Question 18

Which of the SAFe Core Values enables trust across the ART?

Options:

A.

Transparency

B.

Adaptation

C.

Built-in Quality

D.

Decentralized decision-making

Demo: 18 questions
Total 60 questions