Easter Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

SAP E_S4HCON2023 SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Exam Practice Test

Demo: 24 questions
Total 80 questions

SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Question 1

What do you do to prepare the database migration option of a SUM procedure?

There are 3 correct answers

Response:

Options:

A.

Extract the SAP HANA database installation archive

B.

Move the stack.xml update file into the download folder

C.

Extract the SAP HANA client installation archive

D.

Move the SAPM update archive into the download folder

E.

Move the R3trans update archive into the download folder

Question 2

You are running an SAP ECC system.

For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?

Note There are 3 correct answers to this question

Options:

A.

Upgrade the SAP system

B.

Perform an SAP S/4 HANA conversion without DMO

C.

Perform an SAP S/4 HANA conversion including DMO

D.

Apply SAP support packages

E.

Use DMO for SUM

Question 3

Which are valid options to check the progress of the database migration in a Microsoft Windows environment?

There is correct answers to this question.

Response:

Options:

A.

Check the "Charts Control Center" in the SUM UI

B.

Check logs for jobs starting with "RSUPG_SGEN" in the system

C.

Check the log files written under "SUM\abap\log"

D.

Check the dump size of the database export on disk

Question 4

You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.

What does the "Calculated level" indicate for those software components?

Please choose the correct answer.

Response:

Options:

A.

The SAP Support Packages that will be bound to the upgrade

B.

The SAP Support Packages contained in the upgrade media

C.

The SAP Support Packages found in the download directory

D.

The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

Question 5

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?

Please choose the correct answer.

Response:

Options:

A.

Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

B.

Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.

C.

Perform the Unicode conversion before the upgrade to SAP ECC 6.08.

D.

Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

Question 6

You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.

Following SAP recommendations, how will you achieve this?

There are 2 correct answers to this question.

Response:

Options:

A.

Specify the business functions that need to be switched on during the prepare part of SUM.

B.

Import a transport request from the development system that contains the recording of the activation.

C.

Activate the required business functions manually in the production system.

D.

During conversion, SUM delivers some business functions already activated.

Question 7

You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

Options:

A.

Apply the corresponding SAP note via SAP Note Assistant

B.

Generate it by analyzing the specific custom code via RFC

C.

Configure it within transaction ATC

D.

Download it from SAP Support Portal

Question 8

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

Options:

A.

After SUM has ended

B.

During the Execution roadmap step

C.

Before the start of the SUM technical downtime

D.

During the SUM technical downtime

Question 9

In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

Options:

A.

When performing an SAP S/4HANA conversion with DMO

B.

When performing an SAP S/4HANA conversion without u DMO

C.

When upgrading an SAP S/4HANA Server system

D.

When upgrading an SAP ECC system with DMO

Question 10

What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

Options:

A.

Standalone AS ABAP with SAP_BASIS 752 and above

B.

SAP ECC system from SAP ERP 6.0 EHP 8

C.

SAP Solution Manager 7.2

D.

SAP S/4HANA Server 1809 and above

Question 11

Which Guides contain information about SUM phases starting with "EU_CLONE_"?

There are 2 correct answers to this question.

Response:

Options:

A.

The SAP S/HANA Conversion Guide

B.

The Application Guide

C.

The major SUM Guide

D.

The DMO Guide

Question 12

What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

Options:

A.

750

B.

700

C.

731

D.

740

Question 13

In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?

There are 2 correct answers to this question.

Options:

A.

During downtime

B.

During SPDD

C.

Post-downtime

D.

During uptime

Question 14

You want to execute a Unicode Conversion only. Which approach do you need to follow?

Please choose the correct answer.

Response:

Options:

A.

SWPM using the Backup / Restore procedure

B.

SUM with DMO

C.

SUM without DMO

D.

SWPM using the Load procedure

Question 15

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

Options:

A.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion SAP S/4HANA conversion without database migration Database migration

D.

SAP S/4HANA conversion including database migration and Unicode conversion

E.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Question 16

Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

Options:

A.

The link to different patch levels to SUM

B.

AA

C.

The corrections to the SUM Guide

D.

An overview about possible upgrade paths

Question 17

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

Options:

A.

SAP S/4HANA conversion including DMO

B.

Prerequisite check

C.

DMO without system update

D.

SAP S/4HANA conversion without DMO

E.

Benchmark tool

Question 18

Which circumstances will allow SUM to run without the creation of a shadow system?

Please choose the correct answer.

Response:

Options:

A.

Using the main configuration option "Single System" when installing an Add-On

B.

Using the main configuration option "Single System" in case of an upgrade.

C.

Using the database migration option (DMO) for SUM

D.

Using the main configuration option "Standard" when applying SAP Support Packages

Question 19

You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

Options:

A.

AA

B.

A Standalone SAP system with ABAP 7.51 or above

C.

An SAP S4HANA 1709 sandbox system

Question 20

When using the DMO of SUM, which files can be handled by SUM in the download directory?

There are 2 correct answers to this question.

Response:

Options:

A.

Parameter file SAPup_add.par

B.

Stack XML file calculated by the Maintenance Planner

C.

Breakpoint configuration file SAPUPPHAS.BRK

D.

MIGRATE J5T_DUR_XML file from a previous run

Question 21

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?

There are 2 correct answers to this question.

Response:

Options:

A.

Run the database migration to the SAP HANA database

B.

Perform the migration of data into the new data structure

C.

Check the compatibility of custom code with SAP S/4HANA

D.

Apply the recommendations of the simplification list

Question 22

You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?

There are 3 correct answers to this question.

Response:

Options:

A.

Generation of the new ABAP loads in phase RUN_SGEN_GENER8

B.

Import of upgrade and language data from the download directory in phase TABIM UPG

C.

Activation of dictionary objects in phase ACT_UPG

D.

Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

E.

Import of dictionary objects from the download directory in phase DDIC_UPG

Question 23

Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

Options:

A.

Dual Stack split

B.

Support Package Stack update

C.

Database migration

D.

Release upgrade

E.

Homogenous system copy

Question 24

During a DMO procedure with SUM, after which phase is the repository first available on the target database?

Please choose the correct answer.

Response:

Options:

A.

Uptime migration (EU_CLONE_MIG_UT_RUN)

B.

ParaUel distribution (PARDIST_SHD)

C.

Downtime migration (EU_CLONE_MIG_DT_RUN)

D.

Shadow repository creation (EU_IMPORT*)

Demo: 24 questions
Total 80 questions