SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Question 1

Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

Options:

A.

Shadow on target creation

B.

Downtime conversion

C.

Silent data migration (SDM)

D.

Downtime migration

Question 2

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.

The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

Please choose the correct answer.

Response:

Options:

A.

There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

B.

SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

C.

The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.

D.

These are 40 pairs of R3load processes, so there are 80 R3load processes running.

Question 3

You want to perform custom code check via ABAP test cockpit in preparation of your SAP S/4HANA conversion? What kind of SAP System can you use to generate the custom code migration worklist?

Options:

A.

AA

B.

A Standalone SAP system with ABAP 7.51 or above

C.

An SAP S4HANA 1709 sandbox system

Question 4

You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

Options:

A.

Software update

B.

Conversion

C.

Main import

D.

Migration

Question 5

You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?

Please choose the correct answer.

Response:

Options:

A.

An additional temporary database is used during uptime

B.

Dedicated application tables are migrated in uptime

C.

TABIMJJPG is executed in uptime

D.

The repository is migrated in uptime

Question 6

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

Options:

A.

SAP S/4HANA conversion including DMO

B.

Prerequisite check

C.

DMO without system update

D.

SAP S/4HANA conversion without DMO

E.

Benchmark tool

Question 7

You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?

There are 3 correct answers to this question.

Response:

Options:

A.

Generation of the new ABAP loads in phase RUN_SGEN_GENER8

B.

Import of upgrade and language data from the download directory in phase TABIM UPG

C.

Activation of dictionary objects in phase ACT_UPG

D.

Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

E.

Import of dictionary objects from the download directory in phase DDIC_UPG

Question 8

During the configuration of the DMO for SUM, which Migration Parameter selection is NOT possible for an inplace migration?

Options:

A.

DMO with system move

B.

Migration repetition option

C.

Table count verification

D.

Table contents compare

Question 9

You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?

There are 2 correct answers to this question.

Response:

Options:

A.

Conversion of application tables (PARCONV_UPG)

B.

Activation of dictionary objects (ACT_UPG)

C.

Switch to new repository (EU_SWITCH)

D.

Modification adjustment (SPDD)

Question 10

In ICNV. How database operations synchronized between the source and the target table?

Options:

A.

Deletes are directly executed in the target table by delete trigger.

B.

AA

Question 11

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

Options:

A.

After SUM has ended

B.

During the Execution roadmap step

C.

Before the start of the SUM technical downtime

D.

During the SUM technical downtime

Question 12

You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

Options:

A.

Apply the corresponding SAP note via SAP Note Assistant

B.

Generate it by analyzing the specific custom code via RFC

C.

Configure it within transaction ATC

D.

Download it from SAP Support Portal

Question 13

What do you do to prepare the database migration option of a SUM procedure?

There are 3 correct answers

Response:

Options:

A.

Extract the SAP HANA database installation archive

B.

Move the stack.xml update file into the download folder

C.

Extract the SAP HANA client installation archive

D.

Move the SAPM update archive into the download folder

E.

Move the R3trans update archive into the download folder

Question 14

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

Options:

A.

PARMVNT_UPG

B.

TABIMJJPG

C.

PARDIST_SHD

D.

TABIM_SHADOW_*

Question 15

You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

Options:

A.

EU_IMPORT_ALL

B.

EU_CLONE_MIG_DT_CREATE

C.

EU_CLONE_MIG_SOT_RUN

D.

EU_CLONE_MIG_DT_RUN

Question 16

Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

Options:

A.

The link to different patch levels to SUM

B.

AA

C.

The corrections to the SUM Guide

D.

An overview about possible upgrade paths

Question 17

You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

Options:

A.

Modification adjustment (SPAU)

B.

Modification adjustment (SPDD)

C.

Activation of dictionary objects (ACT_UPG)

D.

Conversion of application tables (PARCONV_UPG)

Question 18

You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?

There are 2 correct answers to this question.

Options:

A.

Kernel for target release, Windows, SAP MaxDB

B.

Kernel for target release, Linux, SAP HANA

C.

Kernel for target release, Windows, SAP HANA

D.

Kernel for source release, Windows, SAP MaxDB

Question 19

During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?

There are 2 correct answers to this question.

Response:

Options:

A.

Check for running batch jobs in the shadow system via Job Overview (SM37)

B.

Check for running R3trans processes on the host of the primary application server

C.

Check for running R31oad processes on the host of the primary application server

D.

Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp

Question 20

You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?

Please choose the correct answer.

Options:

A.

Credentials of a named user in client 000 of the shadow system

B.

Credentials of a named user in the development client of the development system

C.

Credentials of user DDIC in client 000 of the shadow system

D.

Credentials of user DDIC in the development client of the development system

Question 21

What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?

There are 3 correct answers to this question.

Response:

Options:

A.

Phases DIFF*

B.

Phase DOWNCONF_DTTRANS

C.

Phase RUN_RSPTBFIL _ISUTABU

D.

Phases EU_IMPORT*

E.

Phase RUN_RSDBSCPY

Question 22

You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer.

Options:

A.

The upgrade of the PRD must be finished before you start new development in the DEV.

B.

The transport domain of systems DEV and QAS must differ from the transport domain of system PRD.

C.

The transport between Unicode and non-Unicode systems is forbidden.

D.

The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD.

Question 23

You are executing as SAP S/4HANA Conversion with scenario strategy Standard. When will the shadow instance be stopped for the last time?

Options:

A.

As part of the cleanup process

B.

Before the downtime starts

C.

Early in the downtime

D.

At the end