You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
In which master data object do you set the standard values for an operation?
When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)
Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
What is SAP Solution Manager?
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)
In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?
Which of the following master data is necessary for the creation of material reservations for production orders?
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
Which of the following structural elements does a process order have? (Choose three.)
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)