New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

SAP C_TSCM42_67 SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Exam Practice Test

Demo: 15 questions
Total 106 questions

SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Questions and Answers

Question 1

You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.

What do you have to consider in this scenario?

Options:

A.

Requirements planning considers only changes that are relevant for scheduling within the planning time fence.

B.

Planned orders are created within the planning time fence and automatically firmed by requirements planning.

C.

The MRP controller cannot create planned orders within the planning time fence.

D.

Planned orders that are created by requirements planning are shifted to the end of the planning time fence.

Question 2

In which master data object do you set the standard values for an operation?

Options:

A.

Material Master

B.

Work Center

C.

Routing

D.

Production Resource/Tool (PRT)

Question 3

When modeling in-house production using SAP ECC, on which business levels can you create a bill of material (BOM)? (Choose two)

Options:

A.

At the company code level

B.

At the plant level

C.

At the business area level

D.

At the client level

Question 4

When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)

Options:

A.

General values from work scheduling view in the material master

B.

Standard value from operation in task list

C.

User-defined field from operation in task list

D.

General operation values in task list

E.

General item values in bill of materials

Question 5

Which of the following situations occur when a production order is set to Technically Complete (TECO)? (Choose three.)

Options:

A.

The order and its operations receive the system status Locked (LKD).

B.

Reservations are deleted.

C.

Purchase orders for external operations or non-stock materials are deleted.

D.

The order is no longer relevant for Material Requirements Planning.

E.

Capacity requirements are deleted.

Question 6

The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?

Options:

A.

Substitute sequence

B.

Alternative sequence

C.

Parallel sequence

D.

Standard sequence

Question 7

What is SAP Solution Manager?

Options:

A.

A transaction in the SAP ECC system

B.

A standalone system that communicates with other systems in a system landscape

C.

An add-on industry solution

D.

A managed system in a system landscape

Question 8

Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)

Options:

A.

Master recipe-based manufacturing.

B.

Material requirements planning for production resources.

C.

Manufacturing without orders.

D.

Variable calculation of material quantities (product output, material usage).

E.

Manufacturing in charge quantities.

Question 9

In SAP ECC, you want to map an in-house production process for general warehouse production. The fields in the area of the lot size-dependent in-house production time are to be populated when the material master for the final product is created. These fields can be maintained by updating from the scheduling result for the associated routing. You now think that there could be significant changes to the production times in the routing and decide against updating the material master. What problem could this lead to?

Options:

A.

Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.

B.

Requirements planning runs up against an exception message in basic dates scheduling because the material master parameters do not match the scheduling result from the routing.

C.

In the course of basic dates scheduling with requirements planning, dependent requirements request the components from the bill of materials at the wrong times.

D.

Lead time scheduling, which occurs by the time that a planned order is converted into a production order (at the latest), cannot take place on the basis of incorrect basic dates.

Question 10

Which of the following master data is necessary for the creation of material reservations for production orders?

Options:

A.

Material master records

B.

Production/resource tools

C.

Routings

D.

Production versions

Question 11

You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.

How can you fulfill these requirements in SAP ECC? (Choose two)

Options:

A.

Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.

B.

Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

C.

Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

D.

Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.

Question 12

Which of the following structural elements does a process order have? (Choose three.)

Options:

A.

Item data

B.

Parallel sequences

C.

Relationships

D.

Phases

E.

Characteristic-based process instructions

Question 13

You want to use the different options for planning in SAP ECC.

What is the correct sequence of the planning procedures?

Options:

A.

Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning

B.

Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning

C.

Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning

D.

Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning

Question 14

Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.

How is the resulting firming interval specified in this scenario?

Options:

A.

By the planning time fence from the material master

B.

By the firming mechanism with the longer firming interval

C.

By the manual firming date

D.

It is predefined in Customizing.

Question 15

During the processing of production orders planned and actual costs are determined.

On which of the following objects can you collect these costs? (Choose two)

Options:

A.

Production order

B.

Product cost collector

C.

Work center

D.

Planned order

Demo: 15 questions
Total 106 questions