New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

SAP C_TS422_2021 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Exam Practice Test

Demo: 12 questions
Total 82 questions

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions and Answers

Question 1

Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

Options:

A.

SAP Ariba

B.

SAP Hybris

C.

SAP Concur

D.

SAP Fieldglass

E.

SAP SuccessFactors

Question 2

Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

Options:

A.

Posting of production costs to the production cost collector

B.

Material staging for nex order in sequence

C.

Archiving of documents for assembly scrap

D.

Posting of goods receipt for the product

E.

Reduction of associated capacity requirements

Question 3

What are some uses for the low-level code assigned to each material?

Options:

A.

It is used in MRP to determine the sequence in which materials are planned.

B.

It is used by product costing to determine how coast are rolled up.

C.

It is used by engineering to indentify subitems in an engineering bill of material (BOM).

D.

it is used by ATP to determine the priority of alternative components.

Question 4

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

Options:

A.

Make-to-order production (20)

B.

Planning at assembly level (70)

C.

Planning with final assembly (40)

D.

Planning without final assembly (50)

Question 5

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

Options:

A.

Production order release

B.

Material requirements planning

C.

Backflushing

D.

Kanban

Question 6

What does the material type influence?

Options:

A.

Which plant specific status is allowed

B.

Which material master views can be maintained

C.

Which document types are allowed

D.

Whether the material is produced in-house, procured externally or bouth

Question 7

Which business processes are affected by setting in the order type-dependent parameters?

Options:

A.

Intiate quality inspections.

B.

Select master data.

C.

Define integration to cost accounting.

D.

Implement engineering changes.

Question 8

An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

Options:

A.

MRP group

B.

Plants parameters

C.

MRP controller

D.

MRP profile

Question 9

Which of the following elements does MRP take into account during net requirement calculation?

Options:

A.

Purchase orders

B.

Lot size

C.

Maximum stock level

D.

Safety stock

Question 10

What is the difference between co-products and by-products?

Options:

A.

Only co-products appear in the process or production order settlement rule.

B.

Only co-products can be manufactured in isolation from the main product.

C.

Only co-products are identified by a special item category in the bill of material (BOM).

D.

Only by-products have a zero inventory valuation.

Question 11

Where do you maintain data to determine the duration of an operation for production?

Options:

A.

Bill of material (BOM)

B.

Routing

C.

Material master

D.

Work center

Question 12

What is the purpose of a reporting point confirmation in repetitive manufacturing?

Options:

A.

To stage different components for a production line simultaneously

B.

To determine the work in progress along the production line

C.

To reduce the total production lead time for along production line

D.

To provide timely updates of inventory management for the staged components

Demo: 12 questions
Total 82 questions