Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?
What are some uses for the low-level code assigned to each material?
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
What does the material type influence?
Which business processes are affected by setting in the order type-dependent parameters?
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
Which of the following elements does MRP take into account during net requirement calculation?
What is the difference between co-products and by-products?
Where do you maintain data to determine the duration of an operation for production?
What is the purpose of a reporting point confirmation in repetitive manufacturing?