New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

SAP C_TS422_1909 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Exam Practice Test

Demo: 12 questions
Total 1 questions

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions and Answers

Question 1

Where do you maintain the duration of a product on operation?

Options:

A.

Bill of material (BOM)

B.

Work instructions

C.

Material master

D.

Routing

Question 2

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.

Options:

A.

Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

B.

Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

C.

Add the agreement to the source list and mark it for MRP relevance.

D.

Add the agreement to the quota arrangement and mark it for MRP relevance.

Question 3

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

Options:

A.

Make-to-order production (20)

B.

Planning without final assembly (50)

C.

Planning with final assembly (40)

D.

Planning at assembly level (70)

Question 4

When do you use variant bills of materials (BOMB)?

Options:

A.

When multiple material is have similar BOMB

B.

When a material has multiple BOMB

C.

When multiple material also have the same BOM

D.

When a material has a configurable BOM

Question 5

What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

Options:

A.

The planned order's component availability is checked

B.

The planned order's components are copied from the picking list.

C.

The planned order is converted to a production order.

D.

The planned order generates capacity requirements.

Question 6

Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.

Options:

A.

Change of the material's procurement type

B.

Creation of a purchasing contract

C.

Change of the storage bin

D.

Creation of dependent requirements

E.

Creation of a sales order

Question 7

You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

Options:

A.

Checking control must have an overall profile assigned in customizing.

B.

Indicator Relevant for finite scheduling must be set.

C.

Checking rule and group must be assigned.

D.

PRT Availability check must be set.

Question 8

In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.

Options:

A.

Use a specific material status.

B.

Use a specific MRP controller.

C.

Use a specific material group

D.

Use a specific MRP type.

Question 9

You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

Options:

A.

Specify a positive planning horizon in the strategy profile.

B.

Specify a negative planning horizon in the strategy profile.

C.

Specify a negative offset time in the strategy profile.

D.

Specify a positive offset time in the strategy profile.

Question 10

What is a work center hierarchy in SAP S/4HANA capacity planning?

Options:

A.

A group of alternative work centers for production, structured in hierarchy levels by prior ties

B.

A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel

C.

A group of work centers in a production line being used in sequence for production

D.

A group of alternative work centers providing a cumulative available capacity for production

Question 11

Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

Options:

A.

Work center

B.

Material

C.

Production version

D.

Plant

Question 12

In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

Options:

A.

MRP type

B.

MRP group

C.

MRP controller

D.

MRP planning file

Demo: 12 questions
Total 1 questions