Question 1

Your customer record defects a characteristic level with in result recording and wants to correct all defects for each inspection ,,,,,,,,,„ How do you satisfy the customer requirement?

Options:

A.

Active defect recoding in the control indicators of the characteristics used in the inspection plan

B.

In the implementation guide, select the one Q-Notification per inspection type

C.

In the implementation guide IMG select the active quality notification checkbox in the defect class for

D.

Use the same report type for all inspection operations

Question 2

During the production inspection, which elements does the system use to determine the layout of results and defects recordings? Note : 3 correct answer

Options:

A.

Report type

B.

Confirmation profiles

C.

Partner profiles

D.

Status profiles

E.

Code groups

Question 3

You have assigned a dynamic modification level to an inspection plan, which dynamic modification criterion is pre-defined and not editable?

Options:

A.

Customer

B.

Vendor

C.

Material

D.

Manufacturer

Question 4

From which tables does quality management information system (QMIS) retrieve data?

Options:

A.

Early warning processes

B.

Control charts

C.

Info structure

D.

Structure figures

Question 5

For which structure elements of a quality notification can you assign a status profile? Note : 2 correct answer

Options:

A.

Items

B.

Header

C.

Follow up actions

D.

Activities

E.

Tasks

Question 6

Which settings are required for the immediate creation of inspection instruction during goods receipt process. Note : 3 correct answer

Options:

A.

Inspection type settings in the implementation guide (IMG)

B.

Inspection type settings in Material master

C.

Control setting in characteristic of the task list

D.

Control setting in quality info record

E.

Settings for print control in implementation Guide (IMG)

Question 7

Which type of inspection point exist in the system.(3 correct ans)

Options:

A.

Inspection point for equipment

B.

Inspection point for Physical sample

C.

Inspection point for incoming certificates

D.

Inspection point for defects recording

E.

Inspection point for functional location

Question 8

Which business object must you use to create a stability study?

Options:

A.

Quality inspection lot

B.

Physical sample

C.

Quality notification

D.

Sample drawing procedure

Question 9

You use a status profile in the quality info record in procurement, under which circumstances does the system create an inspection

lot of the

next supplier relationship during gr processing?

Options:

A.

When the vendor attains an A in the vendor Evolution

B.

When the usage decision for the previous inspection lot was rej

C.

When there is an open inspection lot for the current supplier relationship status

D.

When the UD for the previous inspection lot was accepted

Question 10

When creating a process order, what type of task list is primary used for inspection ? Correct 3

Options:

A.

Routings

B.

master recipe

C.

Equipment

D.

Reference rate routing

Question 11

During an inspection the lab technicians record the same test values for an

inspection characteristic.

Which of the following do they assign to the products?

Options:

A.

As a sample size

B.

As an inspection point

C.

As a partial lot

D.

As a batch

Question 12

You can user business application programing interface (BAPIs) for different tests Which of the following statements describes a BAPI?

Options:

A.

A reporting transaction

B.

A customer exit

C.

An enhancement point

D.

Complex function module