SAP C_TS413_2021 SAP Certified Application Associate - SAP S/4HANA Asset Management Exam Practice Test

Demo: 13 questions
Total 87 questions

SAP Certified Application Associate - SAP S/4HANA Asset Management Questions and Answers

Question 1

Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.

Options:

A.

Select and print the maintenance order shop papers.

B.

Display the current location of the technical object.

C.

Add a URL to provide further information.

D.

View details of the technical object by navigating to the Asset Viewer.

E.

Input estimated costs for repair malfunction.

Question 2

Which functionalities are available in the SAP Asset Manager fora maintenance worker? Note: There are 2 correct answers to this question.

Options:

A.

Display maps. Display and maintain technical objects

B.

Change BOM. Create a work order on the ESRI map

C.

Schedule resources. Change task list

D.

Confirm time sheets. Attach documents

Question 3

You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?

Options:

A.

Historical Orders list

B.

Structure Display

C.

Location Analysis list

D.

Usage list

Question 4

The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?

Options:

A.

An activity in the notification header

B.

A text in the subject long text screen

C.

A task in the notification item

D.

An entry in the object list

Question 5

How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.

Options:

A.

By assigning a PFCG role with an SAP Fiori catalog

B.

By assigning a PFCG role with an SAP Fiori tile group

C.

By assigning a portal role with an SAP Fiori catalog

D.

By assigning the tiles directly

Question 6

Which parameter in the material master is a prerequisite for refurbishment?

Options:

A.

Valuation class 8000

B.

Valuation category C (condition-based)

C.

Valuation type H (origin)

D.

Valuation category B (in-house/external procurement)

Question 7

How does a performance-based maintenance plan calculate the interval between start date and planned date?

Options:

A.

Cycle length divided by annual performance

B.

Cycle length divided by monthly performance

C.

Cycle length divided by ((scheduling period) x (cycle modification factor))

D.

Cycle length divided by (annual performance / 365)

Question 8

Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

Options:

A.

Cancel dispatched maintenance order operations.

B.

Schedule and dispatch maintenance operations by shifts.

C.

Monitor maintenance order operations due in the next 4 weeks.

D.

Print job papers from a maintenance order.

Question 9

Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

Options:

A.

Scheduling period

B.

Factory calendar

C.

Start date

D.

Scheduling indicator

Question 10

Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion.

Options:

A.

Release. Print

B.

Put in Process.

Schedule

C.

Release. Start Work

D.

Complete. Close Report

Question 11

A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.

Options:

A.

True

B.

False

Question 12

The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.

Options:

A.

Open reservations can be cleared when a maintenance order operation is finally confirmed.

B.

For the combination of order type and planner group you can decide when reservations are created.

C.

All open reservations are closed when the maintenance order isset to TECO.

D.

Reservations are created only after a material availability checkhas been performed.

Question 13

Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question.

Options:

A.

The planner can change estimated costs only at header level.

B.

Shop papers can only be printed after the order release.

C.

Goods receipts for external services can be entered.

D.

The controller can determine actual cost surcharges.

E.

The planner can change planned costs at operation level.