Question 1

When you plan an audit for which component can you define partners? (2 correct Ans)

Options:

A.

Audit Question

B.

Question

C.

Audit

D.

CAPA

Question 2

Your customer uses MIC and requests automatic defect recording After configuration defect recording the implementation Guide ,which additional steps must you perform to satisfy customer requirements?(2 correct ans)

Options:

A.

Activate defects recording in the characteristic control indicator for your MIC

B.

Assign an inspection method to your MIC

C.

Assign a notification type to an inspection type

D.

Select the radio button to activate quality notification in the defect class

Question 3

For what type of cost collector does an inspection lot capture appraisal and non conformity costing?

Options:

A.

A company code general ledger

B.

A quality Notification

C.

A quality management order

D.

A controlling general ledger

Question 4

A buyer creates a purchase order for a material for which QM in procurement is active What does the system verify when a target QM system is assigned to the material master? Note : 3 Correct answer

Options:

A.

The defined assignments for QM systems in the implementation Guide (IMG)

B.

The vendor master

C.

The inspection type

D.

The QM quality info record

E.

The purchasing info record

Question 5

You must assign a certification profile for outgoing certificates to key combination What key combination that require no adjustment does SAP QM prove

Options:

A.

Material /Customer, Material Material type

B.

Material /Customer, Material Material group

C.

Customer, Material, Material group

D.

Material , Customer, Material group

Question 6

By integrating the QM component in the production process, you can monitor and document process capability and the quality of

products.

Which statistical and graphical tools does SAP provide to monitor a process ?

Options:

A.

Statistical process controls (SPC)

B.

Quality management information system

C.

Quality management inspection data interface QM-ID

D.

Statistical report charts

Question 7

Your customer user action boxes in the notification processing and wants relationships to exist between the different In which implementation guide activity do you define these relationships ?

Options:

A.

Activity catalog

B.

Customer status scheme

C.

Functions for action box

D.

Task catalog

Question 8

You have assigned a dynamic modification level to an inspection plan Which dynamic modification criterion is pre-defined and not editable?

Options:

A.

Customer

B.

Manufacturer

C.

Vendor

D.

Material

Question 9

Your customer automatically create inspection lot for general deliveries in sales and distribution process for its production If QM not started result recording what does the system do in response to a change in the material quality.................

Options:

A.

Change the quality of the current inspection lot

B.

Block the current inspection lot from processing

C.

Cancel the current inspection lot and create a new one

D.

Create a new inspection lot with the different quantity

Question 10

The IMG includes a customizing activity in which you assign object categories to a notification type? Which of the following object category already exist in standard setting? (3 Correct Ans)

Options:

A.

Serial number

B.

Batch

C.

Purchase order item

D.

Material

E.

Order(pp-pi)

Question 11

Which catalogue types require the use of selection sets? Correct 2

Options:

A.

Actions

B.

Tasks

C.

Defect type

D.

Characteristic

E.

Usage decision

Question 12

What must you do in configuration to enable defects recording during an inspection with inspection lots? Note : 2 correct answer

Options:

A.

Activate the work flow template

B.

Assign the notification type to the inspection type.

C.

Activate reference to Existing notifications.

D.

Define the defect report type

Demo: 12 questions