Winter Special Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: suredis

Salesforce Energy-and-Utilities-Cloud Salesforce Energy and Utilities Cloud Accredited Professional Exam Exam Practice Test

Salesforce Energy and Utilities Cloud Accredited Professional Exam Questions and Answers

Question 1

An energy utility company is implementing the Customer Acquisition Management application. The application should support unauthenticated self-serve portal users.

What's the preferred method to configure the application security to meet the requirement?

Options:

A.

The Customer Acquisition Management application cannot support unauthenticated self serve portal users

B.

A consultant should assign an EnergyRuntimeSales sample permission set to the Guest User profile and an EnergyRuntimeSalesCustomerCommunityUser sample permission set to customer community users.

C.

A consultant shouldcreate new permission sets to grant appropriate access to all required objects.

D.

A consultant should assign an EnergyftuntimeB2CSales sample permission set to the Guest User profile and an Energyfiuntime82CSalesCustomerCommunityUser sample permission set to customer community users.

Question 2

A call center agent uses the Energy and Utilities Contact Center Console to schedule a field technician appointment for a customer.

What license is needed to complete this customer requirement?

Options:

A.

Salesforce Field Service license

B.

Salesforce Contact Center license

C.

Energy and Utilities Base Service license

D.

Salesforce Service Console license

Question 3

An energy company provides gas and electricity services to some of its customers, but not all When a new customer moves in, what object is used to determine what type of service is available at the premise?

Options:

A.

Meter

B.

Account

C.

Service Point

D.

Asset

Question 4

Energy and Utilities Cloud has the capability to provide access to information using several different data access methods Using the Digital Interaction Platform, online web portals, internal console applications, and mobile applications are all examples of which data access technology?

Options:

A.

Metadata API

B.

Streaming data API

C.

SSO data access

D.

Omnichannel data access

Question 5

The project team wants to use the Customer Acquisition Management application to set up and automate the customer enrollment and selling of utility products, services and offers to new customers A concern is raised about the final Ul layout, which needs to be adapted to the branding of the company.

What two processes can modify the look and feel of the application?

Options:

A.

Modify the VEELogoCard FlexCard to change the customer logo.

B.

Modify the VEEDigitalOrder Omniscript to adapt the look and feel to suit the company's requirements

C.

Modify the VEEConsumerLandingScfeen FlexCard to change the background color, text font size, and style.

D.

Modify the application Page Layout to change/add/remove selected elements

Question 6

When preparing a demo of Energy and Utilities Cloud, the consultant needs to showcase a customer's 360-degree view that allows the customer service agents of the company to see the following information in one glance:

• Identify the caller

• Provide answers to questions about billing. consumption, and payments

• Add meter readings

• Manage user complaints.

• Perform user requests such as Start Service. Stop Service, and Set Up a Payment Plan.

Which two functionalities should theconsultant use to achieve this?

Options:

A.

Configure the Energy and Utilities Contact Center Console available m the process horary

B.

Configure a custom Salesforce Service Cloud console.

C.

Configure custom OmniScripts and FlexCards to cover the requirements.

D.

Assign the relevant lightning pages to the energy company's service agent user profile

Question 7

The administrator of an energy company needs to manage the lifecycle of new contracts in Salesforce. After the generation of the contract, it needs to be sent to the customer for eSignature through DocuSign.

Which two features of Contract Lifecycle Management and OmniStudio can be used?

Options:

A.

The 'Send for eSignature' Velocity action can be used to send the last version of the contract document to DocuSign

B.

An Omni script can be configured, and a DocuSign Envelope action can be used to email the contract for signature.

C.

An Integration Procedure with an HTTP action is needed to integrate with DocuSign. which can be called from an Omniscript

D.

An integration Procedure with a DocuSign Signature action can be called from an Omniscript to email the contract for signature

Question 8

An energy company wants to integrate its current Product Catalog legacy system with its Salesforce org. which uses Industries CPQ. In this API. all products require a Product type, which can be one of four values: Energy, Batteries. Measurement, or Solar Panels This information must be captured in Salesforce and be easily searchable in the org to be sent to the system.

What is the recommended way to design it in Energy and Utilities Cloud?

Options:

A.

A picklist attribute can be configured and associated to the base object type.

B.

A picklist attribute can be configured and associated to each product individual^

C.

A Velocity Picklist can be configured and related to Produc12 object

D.

A picklist field can be added to the Prodoct2 object

Question 9

How is the Energy and Utilities Cloud solution installed on an org?

Options:

A.

Its included as part of core and will be deployed when licenses are purchased

B.

Its installed as a managed package and unmanaged components

C.

A specialized org that Salesforce creates with the solution installed is required

D.

The functionality is unlocked based on the license types assigned to the org

Question 10

An energy company urgently needs to replace its current customer information system (CIS). The current system is at end-of-life and unsupported Because the cost to replace the CIS is so high, executives contemplate putting all other projects on hold. This would delay the planned Energy and Utilities Cloud implementation. The executive committee asks a consultant for a recommended, cost-effective approach to maximize the return on investment.

Which two courses of action should the consultant recommend?

Options:

A.

Implement Energy and Utilities Cloud and simultaneously replace the customer information system with a cloud based billing system.

B.

First, implement Energy and Utilities Cloud and integrate it with the current customer information system through a q middleware platform. Then, replace the customer information system with a more modern one and reconnect the integration points between middleware and the new CIS.

C.

To avoid reworking to integrations, deploy a new customer information system first then implement Energy and Utilities Cloud.

D.

Cancel the Energy and Utilities Cloud implementation and replace the CIS. because modem CIS systems have all the necessary functionality to effectively track and manage customer engagements in any channel.

Question 11

Having completed discovery and solution design, and as the project team moves into the implementation phase, what should be the first step in the build process?

Options:

A.

Start evaluating productsand offerings from as many third-party suppliers as possible.

B.

Immediately start building the solution in their favorite technology.

C.

install Salesforce Service Cloud and start building custom objects and APEX classes.

D.

Select the Energy and Utilities Cloud applications that best meet the company's needs

Question 12

An implementation team has requested an org containing the Energy and Utilities Cloud Large Account Sales Management application. After working with the app. they determine that they need the functionality of the homepage for agents and team leaders.

How does the team get the required components into their development environment?

Options:

A.

The team should follow the documentation and migrate the required components into the* development environment.

B.

The team needs to copy and paste the required components from their trial environment into their development environment.

C.

The team should take a look at the application code, and then go and re-type the code into their development environment.

D.

The team should request the Energy and Utilities Cloud engineering team to deploy the necessary components into the project development environment.