11.11 Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

Nutanix NCSC-Level-1 Nutanix Certified Services Consultant (NCSC): Level 1 Exam Practice Test

Demo: 11 questions
Total 78 questions

Nutanix Certified Services Consultant (NCSC): Level 1 Questions and Answers

Question 1

A consultant is onsite with a customer running Foundation VM (FVM) and discovers that there is no connectivity between the FVM and their laptop. The consultant verifies the following:

* The consultant’s laptop and Nutanix nodes are plugged into a flat switch.

* The laptop, switch and nodes are plugged into supported power supplies.

* The laptop network adapters and FVM are configured with their corresponding IP addresses.

What is the cause for the connectivity failure to the FVM?

Options:

A.

The switch is not plugged into the power supply.

B.

Desktop Firewall is blocking ping requests.

C.

Network cables are not connected.

D.

Laptop WiFi configured to use DHCP.

Question 2

A consultant is viewing an ESXi host via console without external network connectivity.

Which two IP addresses can be used to connect to the CVM (Choose two.)

Options:

A.

192.168.5.253

B.

192.168.5.2

C.

192.168.5.254

D.

192.168.5.1

Question 3

While preparing for a new four-node cluster installation, the consultant has a Tech Review Call with the customer. The hardware is as follows:

* 4 nodes in 1 Block

* 8 x 10 GbE Ports

* 4 x 1 GbE IPMI Ports

* Adequate Ethernet ports are available

* Ethernet cables are correct and available

* Adequate rack space is available

Which remaining item must be confirmed as available onsite?

Options:

A.

Crash Cart

B.

Fibre Channel switches

C.

Redundant 208v power

D.

Redundant 110v power

Question 4

A customer wants to use NIC teaming on an ESXi host using a vSphere Standard Switch configured with the Route based on physical NIC load load balancing option. The customer does not see the option when editing the Teaming and Failover settings for the switch.

How should the consultant resolve this issue?

Options:

A.

Change the load balancing option on the switch.

B.

Add a vSphere Distributed Switch

C.

Add another physical NIC to the team.

D.

Install a vCenter server to manage the switch

Question 5

A consultant is onsite and needs to start their Foundation Virtual Machine (FVM) to image Nutanix hardware. The FVM fails to boot. The consultant decides to use a different Foundation method.

Assuming the nodes will discover, which Foundation type or configuration option should the consultant select?

Options:

A.

Foundation VM

B.

Use IPMI IPs

C.

Use IPMI MACs

D.

Foundation Applet

Question 6

A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.

Which option should be used to resolve this issue?

Options:

A.

If the IPMI is in use, check that the IPMI can ping the default gateway over IPv6.

B.

Make sure that the IPMI and CVM VLAN is manually tagged on the Host and CVM.

C.

Verify that IPv6 Link Local and DHCP is enabled on all switch ports.

D.

If using VLANs, confirm the hypervisor/CVM VLAN is set as Native on the switch ports.

Question 7

A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.

Which configuration is causing this issue?

Options:

A.

ESXi cluster admission control is disabled.

B.

ESXi cluster DRS is enabled.

C.

ESXi cluster HA is enabled.

D.

ESXi cluster admission control is enabled.

Question 8

During the Foundation imaging process, nodes are successfully imaged, but the cluster creation fails.

Which log should the consultant review to determine the cause?

Options:

A.

service.log

B.

foundation.out

C.

first_boot.log

D.

genesis.out

Question 9

A consultant is performing a Nutanix Cluster installation on Dell XC Core hardware. The consultant decides to use Foundation Portable for Mac to perform the installation. When the consultant arrives onsite, Foundation Portable is unable to locate the new nodes.

Which log should the consultant check to troubleshoot this issue?

Options:

A.

/home/nutanix/foundation/log

B.

~/data/logs/foundation.out

C.

foundation.app/contents/resouces/log

D.

~/data/logs/foundation

Question 10

A consultant is imaging a Nutanix cluster with VMware ESXi. Foundation returns an error that the media is not a supported ISO. The consultant checks the whitelist file in Foundation and confirms that the version of the ISO is not listed.

Which three actions should the consultant take to resolve this issue? (Choose three.)

Options:

A.

Replace and save whitelist file in Foundation

B.

Obtain the MD5 checksum of the ISO and confirm MD5 checksum of ISO is listed.

C.

Download the iso_whitelist.json from the Support portal.

D.

Edit the whitelist file in Foundation.

E.

Restart the imaging process in Foundation.

Question 11

A customer has an ESXi Cluster with two 10GbE NICs on each node with the following requirements:

* Solution must follow Nutanix Best Practices

* Network configuration should be redundant

* A vSphere Standard Switch must be utilized

Which load balancing method should be used?

Options:

A.

Route based on originating port ID

B.

Route based on physical NIC load

C.

Route based on IP hash

D.

Route based on source MAC hash

Demo: 11 questions
Total 78 questions