You installed two separate clusters in an isolated data center without outbound network access. The customer wants to troubleshoot issues locally and also create custom Excel reports for capacity utilization from a local server.
In this scenario, which NetApp tool would satisfy this requirement?
Click the Exhibit button.
You want to add an AFF A400 system to an existing 4-node cluster.
Referring to the exhibit, which number points to the ports that are used to cable the new nodes to the cluster interconnect switches.
You have a new 2-node FAS8700 ONTAP 9.8 cluster. One of the nodes has 24x16 TB NL-SAS disks assigned and available for a new aggregate. You created the aggregate with one RAID group and two spare disks.
In this scenario, how many data drives are in the aggregate?
After moving a new AFF A400 cluster into production, the administrator notices error events in ONTAP System Manager regarding SAS HA issues.
In this scenario, which NetApp tool would have identified these errors after the installation process?
After the Installation of a new NetApp FAS system, you use theNetAppDocs tool for site design documentation.
In this scenario, in which three document formats would you create an inventory report? (Choose three.)
Click the Exhibit button.
Immediately after installing a 4-node FAS8200 cluster, you discover that node, “cluster1-02”, must be removed from the cluster. You want to use the cluster remove-node command to remove the node.
Referring to the exhibit, which two statements are correct? (Choose two.)
You installed a new 4-node AFF A400 ONTAP 9.8 cluster. The AFF400 controller data ports were automatically discovered by “automatic port placement”.
In this scenario, which two ONTAP network settings were automatically configured? (Choose two.)
Click the Exhibit button.
Which set of components on a FAS9000 are highlighted in the exhibit?
You are deploying an 8-node AFF A700 by using BES-53248 cluster switches. During the installation, you notice that ports higher than 16 are not coming online. You verify that the additional licenses are installed.
Which two additional steps must be taken to bring the additional ports online? (Choose two.)