A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.
You are a functional consultant for Contoso Entertainment System USA (USMF).
USMF plans to categorize a new night shift in its factory.
You need to create a new cost category named NightShift for the night shift.
To complete this task, sign in to Dynamics 365 portal.
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. IngredientA is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Set up the IngredientB formula line as a phantom BOM.
Does the solution meet the goal?
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products. The finance and production teams want a way to view individual raw material consumption costs in the ledger. You need to add a production group to the finished good to control postings to the ledger. What should you do?
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:
You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product as a catch weight item with batch control. Set the catch weight unit to box and the inventory unit to pounds.
Does the solution meet the goal?
A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifecycle. The solution must meet the following requirements:
You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.
A company plans to implement Dynamics 365 for Finance chain Operations.
You need to determine which manufacturing solutions to use.
Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.
You need to resolve the shop supervisor’s issue.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure costing for raw materials used to manufacture unscented cleaning solution.
Which form should you use?
You need to resolve the issue for UserB.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserF.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserG.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the chocolate items.
Which values should you select? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure the system to meet the requirements.
What should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserE.
Which configuration options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the configuration model to price the motorcycles correctly. What should you do?
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?
You need to set up the correct production solution for the assembly area. Which solution should you implement?
You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to configure the bicycles’ production resource.
Which option should you use?
You need to create the production orders for standard model bicycles.
Which method should you use?
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?
You must ensure that the firepit product is available for sale. How should the product be released?
You need to meet the requirements for User2.
What should you configure?
You need to meet the needs for the large teakwood furniture order.
What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to address the ignition switch issue.
Which three actions should you perform? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to enable the features and configuration keys for the firepits.
Which two features should you enable? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point
You need to meet the substitution requirements for User4 and User5.
What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.