Your snow removal contractor is required to remove snow at two inches but has not responded during a heavy storm. What steps will you take in the future to ensure site safety?
In addition to vision, incentives, action plan, and resources, what is required for the process of change management to be effective?
When designing buildings and considering airflow, which location would be the most appropriate place for air intake?
What is your role as a Facility Manager in developing an emergency preparedness plan that ensures organizational success?
What detailed review process results in a score outlining the status, age, and life cycle condition of a building and its components?
What is the PRIMARY purpose of the Incident Command System (ICS)?
What information does the facility manager need to ensure the proposed cafeteria price increases are reasonable?
What are the three steps in conducting a risk assessment?
What is referenced when demonstrating how a facility management project is directly linked to a corporation's long-range plan, outlining its broad, high-level goals?
When can fire doors inside buildings be propped open?
What are the four phases of a strategy life-cycle model?
What is a way for facility managers to promote sustainability in the workspace?
What, in addition to vision, incentives, action plan, and resources, is required for the change management process to be effective?
During a renovation or construction project, the MOST cost-effective changes that reduce operating and maintenance costs focus on what?
What is NOT typically included in service level agreements (SLAs)?
A facility manager has developed a new health and safety program. What should be the next step?
What is the fourth stage in a well-established model of team development that consists of forming, storming, and norming?
What are intentional, accidental, or natural disasters called?
Which network connection should the facility manager use for a 500-foot (150-meter) distance between a server and a department?
What is used to control lighting, HVAC, and other systems?
When during a major design project is the best time to provide your changes to the design team?
What level of damage and risk is anticipated with the current building code requirements for most buildings?
What best describes a Building Automation System (BAS)?
What may be impacted if requirements aren't captured correctly at the beginning of an Integrated Workplace Management System (IWMS) implementation?
You are assigned to manage a janitorial contract for a large facility, and a dispute has arisen over the method and frequency for cleaning the hallways. What is the most expedient strategy for resolving the dispute?
When are the laws of supply and demand relative to price?
A facility manager is investigating the feasibility of purchasing a new gas-fired turbine. The turbine is expected to be in service for 12 years. The vice president of operations asked the facility manager to calculate how much the turbine will diminish in value each year over its service life. What is being calculated?
What tool can be used to help determine whether a specific change strategy will produce promised results?
What sequential steps should you follow when trying to settle a contract dispute with a contractor?
What is the first step in aligning the facility manager's strategy to the organization's strategy after assembling various inputs and producing the mission and vision statements?
What is a facilities register?
What are the two PRIMARY considerations for mitigation strategies?
What defines the building envelope?
Departments often forget to budget for equipment design and installation costs. What is the best solution?
Your company is evaluating a commercial office building for a new acquisition. What documents are the most important to review during the due diligence process?
What is the best option to speed up the mail delivery process?
What is the MOST effective exposure control to prevent occupational hazards and protect workers?
As part of your communication strategy, you publish a quarterly newsletter that includes information such as upcoming projects as well as any information about changes to any of the business units. What is your purpose for this communication?
How can facilities management improve the sustainability of the building envelope?
How should rainwater from a hospital roof be used?
Your senior leadership decided to implement an energy dashboard to track utility consumption. They want a baseline before commissioning has started to evaluate the results. How should this commissioning information be used on the dashboard?
A company's CFO has instituted a new accounting system, whereby part of the facility management funding is distributed to each department. The facility manager will assess each department for rent, utilities, and services. What is the billing of these expenses called?
After reviewing the lighting of some office areas, a facility manager decides to re-lamp the area. What business and environmental stewardship reasons should the decision primarily be based on?
The building automation systems (BAS) experienced a power loss. The systems are now back online and are accessible by remote monitoring controls. From a remote login, you observe that the indoor air temperatures are warmer than the settings. What should you do?
What is the calculation for the building efficiency ratio?
What is the most important factor to consider when upgrading the Building Management System (BMS)?
Your organization is considering relocating from leased building #1 into leased building #2. Leased building #1 is 55,000 sq. ft. costing $1,100,000 annually. Leased building #2 is 50,000 sq. ft. costing $1,100,000 annually. Building #1 can house 500 people and building #2 can house 580 people. Your company's benchmark is $2,000.00 per person per year for leased space. Which building has a lower cost per sq. ft.?
The finance director has asked the facility manager to prepare a financial analysis comparing two alternatives for roofing system replacements. Each option has a different first cost, annual maintenance, and expected useful life. Which capital investment analysis technique would best consider the time value of money in the comparison?
You have been informed about a heavy water leakage, but you are away from town. How would you guide the on-site staff?
A facility manager provides integrated facility services for a client with multiple mixed-use sites. This includes all services except the client's core business. The annual business review of the services provided identifies dissatisfaction with comfort levels at two of the sites, including the data center building. To improve the service effectively, the client will need to make an extensive capital equipment investment not previously contemplated. What is the BEST way to communicate the HVAC issue to your client?
What safety precautions are MOST important during a partial renovation of a building while keeping the existing business operating?
What term reflects a governance function?
Which bond is returned to contractors who submit unsuccessful proposals?
What is the purpose of a punch-list (defects list) walk-through in construction?
Following a workplace accident, what is the MOST appropriate risk management action for a facility manager?
When is the BEST time for a facility manager to offer suggestions on a project at minimal cost?
The facility manager is managing an office renovation. The entire renovated area is to be re-carpeted with synthetic roll carpet over the weekend. What should be done prior to installation?
You work for an organization that puts a strong emphasis on corporate values and being the employer of choice; truly valuing their people. The organization has put a lot of time and effort into ensuring that policies and procedures are in place to create an environment where employees are valued. This includes the company's performance appraisal system. How do you ensure the employees meet the expectations of the organization as well as your expectations?
What is the BEST way to acknowledge acceptance of completed project deliverables?
What facility management systems' software retains assets building performance with standardized key performance metrics?
How is the Facility Condition Index (FCI) determined?
When designing an industrial workplace, what is the MOST relevant factor to consider?
Which is the MOST important best practice to ensure a successful safety culture?
When in the bidding process can vendors receive clarification to improve the quality of their proposal?
What series of ISO standards defines the requirements of an environmental management system that can be used by the organization to measure and document the organization's environmental impact?
Both the facility and IT managers are asked to assign staff to work together on a major project. Halfway through the project, a power struggle emerges due to divergent views. How should the managers initially intervene?
What is MOST important when creating a facility culture of safety and security?
When considering location alternatives, what should the facility management professional know?
When your company is considering consolidating its real estate portfolio, what are the most critical factors to consider?
When a facility manager initiates an office relocation project, which item is completed first?
A tenant questions annual reconciliation charges for common area and operating expenses per their lease. What is the strongest business practice for ensuring accounting practices are sound?
What is an example of adaptive change?
Which standard would a facility manager use when assigning the floor area for occupant groups?
What are the environmental factors a facilities manager must consider before starting any renovation project to a circa-1960's manufacturing facility?
What does the planned maintenance to corrective maintenance ratio refer to?
During a large real estate project, what are the expenses of planning, design, construction, operation, maintenance, and disposition of a structure over time known as?
You are the Facility Manager for a retail strip mall with strong storefront style standards approved by the local government planning board. A long-term tenant, a Chinese restaurant, wants to construct a tile pagoda-style mansard that does not comply with the lease terms. How should you respond to this tenant’s request?