Black Friday Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

IBM C1000-077 IBM Spectrum Protect Plus V10.1.5 Implementation Exam Practice Test

Demo: 9 questions
Total 60 questions

IBM Spectrum Protect Plus V10.1.5 Implementation Questions and Answers

Question 1

Which action can the administrator take when in the Active Resources pane?

Options:

A.

run a restore

B.

run a clean up

C.

run a snapshot

D.

run a scheduled job immediately

Question 2

Which restore task will cause an Exchange restore to be displayed in the Active Resources pane Spectrum Protect Plus server?

Options:

A.

Duplicate

B.

Granular

C.

Active

D.

Production

Question 3

Where can logs regarding a failed job be downloaded?

Options:

A.

Maintenance and Logs > Job History

B.

Jobs and Operations > Job History

C History and Operations > Job Logs

C.

Reports and Logs > Job Logs

Question 4

How is the license key registered to be used in IBM Spectrum Protect Plus V10.1.5 Server?

Options:

A.

through the IBM Spectrum Protect Plus GUI

B.

through the NetworkManager Text User Interface (nmtui) tool

C.

through the product installation wizard

D.

through the IBM Spectrum Protect Plus Administration Console

Question 5

Which two types of jobs can be deleted?

Options:

A.

backup

B.

restore

C.

report

D.

maintenance

E.

inventory

Question 6

When creating a restore job of a virtual machine which method is selected by default?

Options:

A.

Hypervisor

B.

Test

C.

Production

D.

Clone

Question 7

How is IBM Spectrum Protect Plus V10.1.1 updated to V10.1.5?

Options:

A.

upgrade to IBM Spectrum Protect Plus V10.1.2, then to V10.1.5

B.

upgrade to IBM Spectrum Protect Plus V10.1.3, then to V10.1.5

C.

uninstall IBM Spectrum Protect Plus V10.1.1. then install V10.1.5

D.

upgrade directly to IBM Spectrum Protect Plus V10.1.5

Question 8

Which type of backup is performed when copying data to IBM Spectrum Protect or Cloud Provider?

Options:

A.

Full + differential

B.

Always Full

C.

Always Archive

D.

Full + Incremental

Question 9

What must be done in an IBM Spectrum Protect V8.1.8 server in order to enable archive copies to tape?

Options:

A.

create a container pool with tape overflow

B.

register IBM Spectrum Protect Plus V10.1.5 as an object node

C.

register IBM Spectrum Protect Plus V10.1.5 as a server node

D.

create server to server communication between IBM Spectrum Protect Plus V10.1.5 and IBM Spectrum Protect V8.1.8

Demo: 9 questions
Total 60 questions