Question 1

Power segment function is enabled on UPS2000-G-20kVA. Which will cause the loads connected with PL terminals power- off?

Options:

A.

Overload

B.

Battery under voltage

C.

Mains input interruption

D.

Mains Under voltage

Question 2

To modify the micro-module view of ECC800,users need to log in the WebUI as as admin.

Options:

A.

TRUE

B.

FALSE

Question 3

When turning on the maintenance bypass switch of UPS5000-E, to make sure loads continue to be powered, which should be noted?

Options:

A.

If the UPS works in normal mode you can turn on the maintenance bypass switch

B.

Shutdown the inverter, switch the UPS to bypass mode and turn on the maintenance bypass switch

C.

Perform EPO and turn on the maintenance bypass switch

D.

If the UPS works in ECO mode, you can turn on the maintenance bypass switch

Question 4

The ETH converter can be installed by the magnet on its rear.

Options:

A.

TRUE

B.

FALSE

Question 5

Huawei NetCol5000-A line-level precision air conditioner mainly solves the hot issue of high-density data center

Options:

A.

TRUE

B.

FALSE

Question 6

If IP21 components is configured, the top air outlet kits can also be installed on the UPS5000-E.

Options:

A.

TRUE

B.

FALSE

Question 7

Backup time of battery depends on discharge current of battery.

Options:

A.

TRUE

B.

FALSE

Question 8

For vacuuming the system, the pressure inside the pipes is less than or equal to ( ) Pa (absolute pressure)

Options:

A.

90

B.

80

C.

70

D.

60

Question 9

The access control devices in Huawei FusionModule2000 are classified into ( ).

Options:

A.

Fingerprint and card reader with a keypad.

B.

Fingerprint and card reader

C.

Card reader with a keypad.

D.

Facial recognition access controller

Question 10

In direct ventilation mode, the direct ventilation system exchanges heat between outdoor cool air and indoor hot air.

Options:

A.

TRUE

B.

FALSE

Question 11

Which are optional parts of NetCol8000-C?

Options:

A.

Electric heater

B.

Differential pressure sensor

C.

Air filter

D.

Humidifier

Question 12

The height of the ECC800 collector is () U.

Options:

A.

1

B.

2

C.

3

D.

4

Question 13

UPS5000-E does not support emergency power off.

Options:

A.

TRUE

B.

FALSE

Question 14

ECC800 does not support wireless communications.

Options:

A.

TRUE

B.

FALSE C.

C.

Question 15

The higher the battery charging current is the better.

Options:

A.

TRUE

B.

FALSE

Question 16

During installation, the nitrogen pressure preserve value of NetCol5000-C is ( ) The pressure preserve time is ( )

Options:

A.

1.0 Mpa; 24h

B.

1.0 Mpa; 12h

C.

0.8 Mpa ; 24h

D.

0.8 Mpa; 12h

Question 17

On the NetEco WebUI, one modular can be bound to a maximum of ( ) ECC800(s).

Options:

A.

1

B.

2

C.

3

D.

4

Question 18

Smart Electricity meter of PDU8000 is abnormal, is it possible that:

Options:

A.

The transformation ratio of current or voltage is incorrectly set.

B.

Cables to the voltage collector are not properly connected.

C.

The current transformer is faulty.

D.

The smart electricity is faulty.

Question 19

The reason for using the EPO status interface in the parallel step of the UPS5000-E is ().

Options:

A.

Prevent electric shock and protect personal safety

B.

Power off the load to prevent damage to the load device

C.

Protect the battery from discharge

D.

Cut off the output and set the parallel parameters

Question 20

The UPS5000 anti-seismic kit is applicable to earthquake-prone ones. When earthquake occurs, it provide support for cabinets

Options:

A.

TRUE

B.

FALSE

Question 21

The rack environment unit collects the environment data of IT cabinets

Options:

A.

TRUE

B.

FALSE

Question 22

When UPS are connected in parallel, it is not necessary to check phase sequence.

Options:

A.

TRUE

B.

FALSE

Question 23

The ( ) is used to convert PoE signals into WIFI signals.

Options:

A.

AC actuator

B.

WIFI converter

C.

VCN

D.

Skylight actuator

Question 24

To balance the capacity loss caused by the self-discharge of the battery during the use of the battery, it is necessary to charge the battery continuously and for a long time at constant voltage, which is called ().

Options:

A.

charging

B.

self-discharge

C.

balanced charging

D.

charging test

Question 25

To compensate the capacity loss due to battery self-discharge, battery needs to do

Options:

A.

Float Charging

B.

Self Discharge

C.

Equalized Charging

D.

Charging Test

Question 26

When ATS is in automatic mode, the handle for manual operation must be remove.

Options:

A.

TRUE

B.

FALSE

Question 27

For the half sized NetCol5000-A25 kW, when preserve positive pressure, the pressure is ( ) MPa

Options:

A.

0.8

B.

2

C.

2.5

D.

3

Question 28

If a fire occurs in the FusionModule1000, the smoke detector and heat detector will send a fire alarm to the fire alarm control panel.

Options:

A.

TRUE

B.

FALSE

Question 29

Unpredictable business, expansion and difficult investment is one of the challenges facing the development of traditional data center business.

Options:

A.

TRUE

B.

FALSE

Question 30

() is the signal processing and centralized management module of UPS5000-E

Options:

A.

Energy control module (ECM)

B.

Power Module

C.

Bypass Module

D.

Maintenance bypass module

Question 31

Cold/Hot aisle containment is used to solve the problem of heat dissipation in Data Center.

Options:

A.

TRUE

B.

FALSE

Question 32

Depending on different layouts, the batteries can be deployed inside or outside FusionModule2000

Options:

A.

TRUE

B.

FALSE

Question 33

Which is not included in the routine maintenance of the ECC800 module?

Options:

A.

Check whether the power indicator is normal

B.

Check the fans for the ECC800 module

C.

Check whether the power cable is properly connected

D.

Create a micro-module view

Question 34

Overcharging can cause internal pressure of batteries too high.

Options:

A.

TRUE

B.

FALSE

Question 35

The thermal insulation foam of NetCol5000-C is damage, what happen?

Options:

A.

Fan noise is too loud

B.

The drainage capacity of the equipment is significantly reduced

C.

Pipeline condensation

D.

Fan blocked

Question 36

In NetCol5000-A compressor, if many bubbles exist in the oil sight glass, it indicates that the superheat degree is high.

Options:

A.

TRUE

B.

FALSE