Question 1

A customer attempts to use an HPE Synergy Composer to discover an HPE BladeSystem c7000 enclosure:

The customer is unable to migrate the HPE BLadeSystem c7000 enclosure into the HPE Synergy Composer.

What is preventing the customer from completing this takes?

Options:

A.

The migration must be initiated from the HPE Oneview managing the HPE BladeSystem c7000 enclosure.

B.

The HPE BladeSystem c7000 enclosure must be cabled to the Synergy management network.

C.

The HPe Oneview managing the HPE BladeSystem c7000 enclosure must be upgraded to HPE OneView 3.0 before.

D.

The Synergy Composer only support HPE Synergy products

Question 2

A Synergy integrator is expanding a customer’s HPE Synergy solution. The existing solution includes:

* two HPE Synergy 12000 Frames

* two HPE Virtual Connect SE 40GB F8 modules.

* two HPE Synergy 20Gb interconnect Link Modules.

*highly available management ring with two Synergy Composers.

The integrator plans to add:

* two new HPE synergy 12000 Frames

* two HPE Virtual Connect SE 40GB F8 modules

* two HPE Synergy 20Gb interconnect Link Modules

*redundant Frame Link Modules in each new frame

Which additional components are necessary for successful implementation?

Options:

A.

two CAT6A cables, four 120Gb Interconnect Link Module cables, and two 40Gb QSFP+ to QSFP+ direct attach cables.

B.

two CAT6A cables, four 120Gb Interconnect Link Module cables, and one 40Gb QSFP+ to QSFP+ direct attach cables.

C.

four CAT6A cables, four 120Gb Interconnect Link Module cables, and two 40Gb QSFP+ to QSFP+ direct attach cables.

D.

four CAT6A cables, eight 120Gb Interconnect Link Module cables, and four 40Gb QSFP+ to QSFP+ direct attach cables.

Question 3

A customer has purchased 15 synergy Frames with the following components:

How many frames can the configuration for the Logical Enclosure? (Note: Enter your answer in the answer field below.)

Options:

Question 4

Refer to the exhibits.

A customer has a Synergy 2-frame design, as shown above.

Due to expanding business needs, the customer has ordered a third frame to expand the environment to a 3-frame fabric design, as shown below.

While attempting to extend the Logical Interconnect Group (LIG) for the enclosure group, the Synergy integrator is unable to add the third frame.

What is preventing the integrator from adding the third frame?

Options:

A.

The Virtual Connect SE 40Gb F8 modules are installed in the incorrect location.

B.

The incorrect interconnect Link Module have been installed.

C.

The Frame Link Module firmware has not been updated in the new frame.

D.

The HPE OneView software on the Composer has not been updated to the latest version.

Question 5

A customer has moved a USB bootable drive to another compute module but the compute module fails to boot from the USB device.

What should the Synergy integrator do to resolve this issue?

Options:

A.

In the server Profile. make sure OS Deployment is set to Deployment plan.

B.

Use UEFI System Utilities to disable the B1401 RAID controller.

C.

Verify that the USB drive key is enable in UEFI system Utilities.

D.

Make sure PXE boot is disabled.

Question 6

A customer needs to ttach 20 HPE 11B 6G SAS SFF hadr drives to an HPE Synergy 480 Gen9 compute module. The customer needs a fulty redundant storage solution.

Which HPE Products the customer's needs? Select three.)

Options:

A.

HPE D3940 storage module with HPE Synergy D3940 Redundant I/O Adapter.

B.

HPE D3940 storage module with Single I/O adapter

C.

two HPE Synergy 12Gb SAS Connection Modules

D.

two HPE Smart Array P5420 Controllers

E.

one HPE Smart Array P5420 Controller

F.

one HPE Synergy 12Gb SAS Connection Module

Question 7

A customer has the following requirements for an HPE Synergy solution:

* Data for the internal application needs to be stored in the frame.

* Compute modules needs to have access to a large database on an external storage array.

* The Synergy infrastructure should be managed with HPE OneView

Options:

A.

Two SAS Connection Modules into 1 and 2: two Synergy 40Gb Fb switch module into bays 3 and 4 two Brocade 16Gb/12 Fiber Channel switches into bays 5 and 6

B.

two SAS Connection Modules into bays 1 and 4, two HPE Synergy Connect SE modules into bays 3 and 6

C.

two SAS Connection Modules into bays 1 and 2: two HPE Synergy Connect SE 40Gb F8 modules into bays and 4

D.

two SAS Connection Modules into bays 1 and 4: 4 two Synergy 40Gb F8 switch modules into 2 and 5: two Brocade 16Gb/12 FC Switches into bays 3 and 6

Question 8

A Synergy integrator has planned a highly available Synergy compostable fabric with 20Gn interconnect Link Modules.

What is the maximum number of SY 480 compute the integrator can install into this configuration?

Options:

A.

12

B.

24

C.

36

D.

48

Question 9

Which utility compares currently running firmware with the upgrade firmware for the HPe Synergy FB Switch Module.

Which allows minimal downtime during the aggrade?

Options:

A.

SMU

B.

SUM

C.

VCSU

D.

ISSU