New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

EMC DES-4421 Specialist - Implementation Engineer, PowerEdge MX Modular Exam Exam Practice Test

Demo: 8 questions
Total 54 questions

Specialist - Implementation Engineer, PowerEdge MX Modular Exam Questions and Answers

Question 1

An administrator is configuring a fully populated MX5016s storage sled to be accessed by four MX740c compute sleds. Each compute sled has an H745P Jumbo PERC installed. The disks in the storage sled are evenly distributed across all compute sleds using a Drive-Assigned storage configuration.

What is the maximum number of disks that each compute sled can detect from the MX5016s?

Options:

A.

1

B.

2

C.

4

D.

16

Question 2

What is the benefit of C22 power inlet connectors on the MX7000 chassis?

Options:

A.

Meet higher power requirements

B.

C22 connectors are now standard on PowerEdge

C.

Allow for higher exhaust temperatures

D.

Enable linking together power supplies

Question 3

A datacenter administrator has been tasked to perform firmware updates of the whole chassis and its components based on the latest dell.com catalog.

What is the correct sequence of actions?

Options:

Question 4

A technician has replaced an MX chassis tub. They complete the tub installation and power on the chassis. They notice that the KVM is no longer functional.

What should the technician do after confirming the KVM feature is still enabled in OME-M?

Options:

A.

Ensure all cables connecting the tub to the left ear control panel are connected properly

B.

Ensure all power supplies are connected and powered-on

C.

Ensure all cables connecting the tub to the right ear control panel are connected properly

D.

Ensure all installed Management Modules are connected to the network

Question 5

Match each deployment logical block with its attributes.

Options:

Question 6

An administrator is asked to install and power-on a new MX740c sled in an MX7000 chassis. The administrator inserts the sled and presses the power button. They notice that the power button LED is blinking green. After a short time power button turns to solid green and the server finally turns on.

What operation was in progress when the power button was blinking green?

Options:

A.

iDRAC was booting

B.

Lifecycle Controller update was in progress

C.

Lifecycle Controller was taking firmware inventory

D.

iDRAC was updating firmware

Question 7

In the assigned mapping of the MX5016s storage sled what is an assignment option used for independent storage to be mapped to a compute sled?

Options:

A.

Drive-assigned enables the MX5016s to be split among multiple compute sleds. Each compute node only “sees” the disks that are assigned to it and not the others.

B.

Drive-assigned enables the MXG610s to the first eight drives in the MX5016s.

C.

Enclosure-assigned enables the MX5016 to be split among multiple compute sleds. Each compute node only “sees” the disks that are assigned to it and not the others.

D.

Enclosure-assigned enables the MXG610s to the first eight drives in the MX5016s.

Question 8

An administrator has been tasked with specifying hardware for a deployment having the following requirements:

  • 4 node cluster within a single MX7000 chassis
  • Each node needs a minimum of 6x 2.5” drives
  • 3 TB of memory and 64 physical CPU cores per node

What is the maximum hardware configuration that meets the requirements?

Options:

A.

MX740c with no storage sleds

B.

MX740c with MX5016s storage sleds

C.

MX840c with no storage sleds

D.

MX 840c with MX5016s storage sleds

Demo: 8 questions
Total 54 questions