What must be considered regarding stab-in rails with installing a PowerEdge XE server?
A deployment engineer is installing a PowerEdge XE8640 server in a rack with round holes. They cannot get the outer rail portion to fit flush with the rack frame.
What is the reason the outer rail is not flush with the frame?
A deployment engineer is installing eight PowerEdge XE9680 servers. Two servers will be installed in each of four racks. The data center managers must plan for the power needed to supply power to
the four racks.
What power consumption information can the deployment engineer give the data center manager?
A deployment engineer goes on-site to install a mix of XE systems in a customer testing and development data center. The customer engineering group is stress testing the PowerEdge XE servers to
determine the best XE server for their software applications. As one of the first steps, they must ensure the correct server rails are on-site.
Which three options are a correct matching of rail type with server type?