Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70percent

BCS CTFL4 ISTQB Certified Tester Foundation Level CTFL 4.0 Exam Exam Practice Test

Demo: 55 questions
Total 188 questions

ISTQB Certified Tester Foundation Level CTFL 4.0 Exam Questions and Answers

Question 1

As a tester, as part of a V-model project, you are currently executing some tests aimed at verifying if a mobile app asks the user to grant the proper access permissions during the installation process and after the installation process. The requirements specification states that in both cases the app shall ask the user to grant access permissions only to the camera and photos stored on the device. However, you observe that the app also asks the user to grant access permission to all contacts on the device. Consider the following items:

[I]. Test environment

[ii]. Expected result

[iii]. Actual result.

[IV] Test level.

[V]. Root cause.

Based on only the given information, which of the items listed above, are you able to CORRECTLY specify in a defect report?

Options:

A.

[l] and [IV]

B.

[ii] and [III].

C.

[ii], [iii] and [v]

D.

[ii], [IV] and [V].

Question 2

Which of the following statements about error guessing is true?

Options:

A.

Error guessing is a system that adopts artificial intelligence to predict whether software components are likely to contain defects or not

B.

Experienced testers, when applying error guessing, rely on the use of a high-level list of what needs to be tested as a guide to find defects

C.

Error guessing refers to the ability of a system or component to continue normal operation despite the presence of erroneous inputs

D.

Experienced testers, when applying error guessing technique, can anticipate where errors, defects and failures have occurred and target their tests at those issues

Question 3

Consider an estimation session in which a six-member Agile team (Memb1..... Memb6) uses the planning poker technique to estimate a user story (in story points). The team members will use a set of cards with the following values: 1,2, 3,5, 8,13,21. Below is the outcome of the first round of estimation for this session:

Which of the following answers BEST describes how the estimation session should proceed?

Options:

A.

The final estimate of the user story in story points is determined by applying the three-point estimation technique with the following input values most optimistic estimate - 1, most likely estimate - 3, and most pessimistic estimate - 21

B.

Further estimation rounds should be performed until all team members will pick the card having the same value: this value will represent the final estimate of the user story in story points.

C.

The final estimate of the user story in story points is determined by calculating the average value between the most optimistic estimate of 21 story points (Memb4> and the most pessimistic estimate of 1 story point (Memb6)

D.

Memb6 and Memb4 which have produced the most pessimistic and the most optimistic estimates respectively, should explain the reasons of their choices to stimulate a discussion between all members before proceeding to another estimation round

Question 4

The whole-team approach:

Options:

A.

promotes the idea that all team members should have a thorough understanding of test techniques

B.

is a consensus-based approach that engages the whole team in estimating the user stories

C.

promotes the idea that all team members should be responsible for the quality of the product

D.

is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence

Question 5

Which of the following is an advantage of the whole team approach?

Options:

A.

It helps avoid the risk of tasks associated with a user story not moving through the Agile task board at an acceptable rate during an iteration.

B.

It helps team members understand the current status of an iteration by visualising the amount of work left to do compared to the time allotted for the iteration

C.

It helps the whole team be more effective in test case design by requiring all team members to master all types of test techniques.

D.

It helps team members develop better relationships with each other and make their collaboration more effective for the benefit of the project.

Question 6

For each test case to be executed, the following table specifies its dependencies and the required configuration of the test environment for running such test case:

Assume that C0NF1 is the initial configuration of the test environment Based on this assumption, which of the following is a test execution schedule that is compatible with the specified dependencies and allows minimising the number of switches between the different configurations of the test environment^

Options:

A.

TC4, TC3, TC2, TC1, TC5.

B.

TCI, TC5, TC4, TC3, TC2

C.

TC4, TC3, TC2, TC5, TC1.

D.

TC4, TC1, TC5, TC2, TC3

Question 7

Scenario 2 “Big Drop”:

A company“The Big Drop”providesbulk discounts and frequent customer discountsas follows:

How manypossible decision rulescan be extracted from this table?

Options:

A.

5 decision rules

B.

6 decision rules

C.

32 decision rules

D.

8 decision rules

Question 8

A system has a self-diagnostics module that starts executing after the system is reset. The diagnostics are running 12 different tests on the systems memory hardware. The following is one of the requirements set for the diagnostics module:

'The time taking the diagnostics tests to execute shall be less than 2 seconds' Which of the following is a failure related to the specified requirement?

Options:

A.

The diagnostic tests fail to start after a system reset

B.

The diagnostic tests take too much time to execute

C.

The diagnostic tests that measure the speed of the memory, fail

D.

The diagnostic tests fail due to incorrect implementation of the test code

Question 9

Which of the following statements about checklist-based testing is TRUE?

Options:

A.

Checklist-based testing is a technique for managing the review meeting that can be applied in those reviews where the use of checklists is mandatory, as is often the case in formal reviews.

B.

Checklist-based testing is a review technique that can be used in a formal review process where reviewers, during individual review, try to detect issues within the work product based on a checklist

C.

In checklist-based testing, using checklists at a high level of detail is more likely to produce test cases that are easier to reproduce than those using checklists at a low level of detail

D.

Checklists used in checklist-based testing should be reviewed periodically for updates as, over time, test cases designed using the same checklist may become less effective at finding defects.

Question 10

The following rules determine the annual bonus to be paid to a salesman of a company based on the total annual amount of the sales made (referred to as TAS).

If the TAS is between 50k€ and 80k€, the bonus is 10%. If the TAS exceeds 80k€ by a value not greater than 40k€, the bonus is 15%. Finally, if the TAS

exceeds the maximum threshold which entitles to a 15% bonus, the bonus is 22%.

Consider applying equivalence partitioning to the TAS (Note: 1k€ = 1000 euros).

Which one of the following answers contain only test cases that belong to the same equivalence partition?

Options:

A.

TC1 = 81 k€; TC2= 97k€; TC3=111k€; TC4=118k€

B.

TC1 = 40k€; TC2= 46k€; TC3=51k€; TC4=53k€

C.

TC1 = 79k€; TC2= 80k€; TC3=81k€; TC4=82k€

D.

TC1 = 90k€; TC2= 110k€; TC3=125k€: TC4=140k€

Question 11

The four test levels used in ISTQB syllabus are:

1. Component (unit) testing

2. Integration testing

3. System testing

4. Acceptance testing

An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

Options:

A.

It is allowed as organizations can decide on men test levels to do depending on the context of the system under test

B.

It is allowed because integration testing is not an important test level arc! can be dispensed with.

C.

It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality

D.

It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model

Question 12

As a result of the joint evaluation of a product version with the customer, it has been concluded that it would be appropriate to retrieve an earlier version of the product and carry out a benchmark. Depending on the result, further development will be carried out based on the current version or the retrieved version.

Which mechanism, process, and/or technique will allow the specific version (including the testing work products) of a given software product to be restored?

Options:

A.

Defect management

B.

Configuration management

C.

Change management

D.

Risk management

Question 13

A requirement specifies that a certain identifier (ID) must be between 5 and 10 characters long, must contain only alphanumenc characters, and its first character must be a letter As a tester, you want to apply one-dimensional equivalence partitioning to test this ID. This means that you have to apply equivalence partitioning individually: to the length of the ID, the type of characters contained within the ID, and the type of the first character of the ID. What is the number of partitions to cover?

Options:

A.

7.

B.

6.

C.

5.

D.

3.

Question 14

Which of the following statements about white-box test techniques is true?

Options:

A.

Achieving full statement coverage and full branch coverage for a software product means that such software product has been fully tested and there are no remaining bugs within the code

B.

Code-related white-box test techniques are not required to measure the actual code coverage achieved by black-box testing, as code coverage can be measured using the coverage criteria associated with black-box test techniques

C.

Branch coverage is the most thorough code-related white-box test technique, and therefore applicable standards prescribe achieving full branch coverage at the highest safety levels for safety-critical systems

D.

Code-related white-box test techniques provide an objective measure of coverage and can be used to complement black-box test techniques to increase confidence in the code

Question 15

Which of the following is not an example of a typical generic skill required for testing?

Options:

A.

Be able to apply test-driven development

B.

Be able to use test management tools and defect tracking tools

C.

Be able to communicate defects and failures to developers as objectively as possible

D.

Possess the necessary social skills that support effective teamwork

Question 16

Which of the following applications will be the MOST suitable for testing by Use Cases

Options:

A.

Accuracy and usability of a new Navigation system compared with previous system

B.

A billing system used to calculate monthly charge based or large number of subscribers parameters

C.

The ability of an Anti virus package to detect and quarantine a new threat

D.

Suitability and performance of a Multi media (audio video based) system to a new operating system

Question 17

Use Scenario 1 “Happy Tomatoes” (from the previous question).

Using theBoundary Value Analysis (BVA)technique (in its two-point variant), identify the set of input values that provides the HIGHEST coverage.

Options:

A.

{7,8,21,22,29,30}

B.

{7,8,22,23,29,30}

C.

{6,7,8,21,22,29,31}

D.

{6,7,21,22,29,30}

Question 18

Test automation allows you to:

Options:

A.

demonstrate the absence of defects

B.

produce tests that are less subject to human errors

C.

avoid performing exploratory testing

D.

increase test process efficiency by facilitating management of defects

Question 19

Which two of the following statements describe the advantages provided by good traceability between the test basis and test work products?

I. Analyzing the impact of changes.

ii. A measure of code quality.

iii. Accurate test estimation.

iv. Making testing auditable.

Select the correct answer:

Options:

A.

i and ii

B.

i and iv

C.

i and iii

D.

ii and iii

Question 20

An application is subjected to a constant load for an extended period of time as part of a performance test While running this test, the response time of the application steadily slows down, which results in a requirement not being met This slowdown is caused by a memory leak where the application code does not properly release some of the dynamically allocated memory when it is no longer needed. Which of the following statements is TRUE?

Options:

A.

The slowdown is a failure while the memory leak is a defect

B.

The slowdown is a defect while the memory leak is an error.

C.

The slowdown is an error; the memory leak is a defect.

D.

The slowdown is a defect; the memory leak is a failure.

Question 21

Which of the following statements about the shift-left approach is FALSE?

Options:

A.

The shift-left approach can only be implemented with test automation

B.

The shift-left approach in testing is compatible with DevOps practices.

C.

The shift-left approach can involve security vulnerabilities

D.

The shift-left approach can be supported by static analysis tools.

Question 22

Which ONE of the following options BEST describes thethird test quadrant (Q3)?

Options:

A.

This test quadrant contains smoke tests and non-functional tests (except usability tests). These tests are often automated.

B.

This test quadrant is business-facing and criticizes the system. It contains exploratory testing, usability testing, and user acceptance testing.

C.

This test quadrant contains functional tests, examples, user story tests, user experience prototypes,API testing, and simulations. These tests check the acceptance criteria and can be manual or automated.

D.

This test quadrant is technology-facing and supports the team. These tests should be automated and included in the continuous integration (CI) process.

Question 23

Consider the followingiteration planning taskswhere a tester can provide value:

    Break down user stories into tasks (particularly testing tasks)

    Estimate test effort for all testing tasks

    Identify and refine functional and non-functional aspects of the test object

Which ONE of the following tasks should be ADDED to the above list?

Options:

A.

Determining the test strategy

B.

Participating in the detailed risk analysis of user stories and determining their testability

C.

Planning the testing for the release

D.

Writing testable user stories and acceptance criteria

Question 24

Scenario 1 “Happy Tomatoes” (used for questions 20-22):

An intelligent application for agricultural use incorporates temperature sensors located at different points of an enclosure. The sensors measure and record the temperature at regular intervals and extract the statistical values for these measurements. These values include the average daily temperature.

A new variety of tomatoes is currently being grown and the“World Organization for Happy Tomatoes”has established temperature ranges related to vegetative development.

When the system establishes that the average temperature is within a specific range, it emits a value that will be used to monitor and control the crop.

Using theequivalence partitioningtechnique, identify the set of input values that provides the HIGHEST coverage.

Options:

A.

{7,10,21,40}

B.

{8,10,25,40}

C.

{7,10,25,29}

D.

{7,10,25,40}

Question 25

Consider a review for a high-level architectural document written by a software architect. The architect does most of the review preparation work, including distributing the document to reviewers before the review meeting. However, reviewers are not required to analyze the document in advance, and during the review meeting the software architect explains the document step by step. The only goal of this review is to establish a common understanding of the software architecture that will be used in a software development project.

Which of the following review types does this review refer to?

Options:

A.

Inspection

B.

Audit

C.

Walkthrough

D.

Informal review

Question 26

Consider the following list of activities (I to V):

I. Test design

II. Test planning

III. Review test basis

IV. Be a facilitator of a peer review

V. Test monitoring and control

Which ONE of the following options identifies the activities that the test management role is MAINLY focused on?

Options:

A.

Activities III, IV, and V

B.

Activities II and V

C.

Activities I and V

D.

Activities I, III, and IV

Question 27

Which of the following statements best describes how configuration management supports testing?

Options:

A.

Configuration management helps reduce testing effort by identifying a manageable number of test environment configurations in which to test the software, out of all possible configurations of the environment in which the software will be released

B.

Configuration management is an administrative discipline that includes change control, which is the process of controlling the changes to identified items referred to as Configuration Items'

C.

Configuration management is an approach to interoperability testing where tests are executed in the cloud, as the cloud can provide cost-effective access to multiple configurations of the test environments

D.

Configuration management helps ensure that all relevant project documentation and software items are uniquely identified in all their versions and therefore can be unambiguously referenced in test documentation

Question 28

A test status report SHOULD:

Options:

A.

Specify the impediments to carrying out the planned test activities in the reporting period and the corresponding solutions put in place to remove them

B.

Be produced as part of test completion activities and report unmitigated product risks to support the decision whether or not to release the product

C.

Always be based on the same template within an organisation, as its structure and contents should not be affected by the audience to which the report is presented.

D.

Specify the lines of communication between testing, other lifecycle activities, and within the organisation that were chosen at the outset of the test project.

Question 29

Consider the following user story about an e-commerce website's registration feature that only allows registered users to make purchases ; As a new user, I want to register to the website, so that I can start shopping online"

The following are some of the acceptance criteria defined for the user story

[a] The registration form consists of the following fields: username, email address, first name, last name, date of birth, password and repeat password.

[b] To submit the registration request, the new user must fill in all the fields of the registration form with valid values and must agree to the terms and conditions.

[c] To be valid, the email address must not be provided by free online mail services that allow to create disposable email addresses. A dedicated error message must be presented to inform the new user when an invalid address is entered.

[d] To be valid, the first name and last name must contain only alphabetic characters and must be between 2 and 80 characters long A dedicated error message must be presented to inform the new user when an invalid first name and/or the last name is entered

[e] After submitting the registration request, the new user must receive an e-mail containing the confirmation link to the e-mail address specified in the registration form

Based only on the given information, which of the following ATDD tests is MOST LIKELY to be written first?

Options:

A.

The new user enters valid values in the fields of the registration form, except for the email address, where he/she enters an e-mail address provided by a free online mail service that allow to create disposable email addresses. Then he/she is informed by the website about this issue.

B.

The new user enters valid values in the fields of the registration form, except for the first name, where he/she enters a first name with 10 characters that contains a number. Then he/she is informed by the website about this issue.

C.

The user accesses the website with a username and password, and successfully places a purchase order for five items, paying by Mastercard credit card

D.

The new user enters valid values in all the fields of the registration form, confirms to accept all the terms and conditions, submits the registration request and then receives an e-mail containing the confirmation link to the e-mail address specified in the registration form

Question 30

A typical objective of testing is to ensure that:

Options:

A.

testing is used to drive the development of a software

B.

a software has been tested using a combination of test techniques

C.

there are no defects in a software that is about to be released

D.

a software has been properly covered

Question 31

Metrics can be collected during and at the end of testing activities to assess which of the following?

i. Progress against the planned schedule and budget.

II. Current quality of the test object.

Hi. Adequacy of the test approach.

iv. Effectiveness of the test activities with respect to the objectives.

v. All the above.

Select the correct answer:

Options:

A.

Only i and ii.

B.

Only i and iii.

C.

Only I, ii and iv.

D.

Only v.

Question 32

Which ONE of the following statements would you expect to be the MOST DIRECT advantage of the whole-team approach?

Options:

A.

Capitalizing on the combined skills of business representatives, testers, and developers working together to contribute to project success.

B.

Reducing the involvement of business representatives because of enhanced communication and collaboration between testers and developers.

C.

Avoiding requirements misunderstandings that may not have been detected until dynamic testing when they are more expensive to fix.

D.

Having an automated build and test process, at least once a day, that detects integration errors early and quickly.

Question 33

Which of the following is a factor that contributes to a successful review?

Options:

A.

All participants in the review are aware they will be evaluated based on the defects they will find

B.

The author of the work product to be reviewed leads the review meeting.

C.

All participants in the review are trained to deal with the review type and its objectives.

D.

Review metrics must be collected to improve the review process

Question 34

For each of the test cases to be executed, the following table specifies the priority order and dependencies on other test cases

Which of the following test execution schedules is compatible with the logical dependencies and allows executing the test cases in priority order?

Options:

A.

TC4, TC3, TC2, TC6, TC5. TC1

B.

TC4, TC6, TC3, TC2, TC5, TC1

C.

TC3, TC5, TC6, TC1, TC4, TC3

D.

TC4, TC3, TC2, TC6, TC1, TC5

Question 35

Atypical generic skill required for the role of tester is the ability to

Options:

A.

Take on the role of developer to meet challenging project deadlines

B.

Assume leadership aimed at imposing decisions on the rest of the team.

C.

Use tools to make the execution of repetitive testing tasks more efficient.

D.

Determine the corrective actions to get a test project on track in case of deviations from the test plan

Question 36

The statement: "Test activities should start in the early stages of the lifecycle, adhering to the testing principle of early testing” is relevant to which of the recognized software development models?

Options:

A.

Sequential development model.

B.

Iterative development model.

C.

Incremental development model.

D.

All the above

Question 37

In which one of the following test techniques are test cases derived from the analysis of the software architecture?

Options:

A.

Black-box test techniques.

B.

Experience-based test techniques.

C.

Checklist-based test techniques.

D.

White-box test techniques.

Question 38

You are testing a system that is used in motor vehicles to warn the driver of an obstacle when re-versing. Output is provided by a series of LED lights (green, yellow, and red), each illuminated based on clearly defined conditions.

The following summary describes the functionality:

•Object within 10 metres, green LED lit.

•Object within 5 metres, yellow LED lit.

•Object within 1 metre, red LED lit.

•Setting sensitivity mode to "ON" will result in only the red LED being lit when the object is within 1 metre.

The following decision table describes the rules associated with the functioning of this proximity warning system:

Which intended functionality is tested by Rule 5 in the decision table?

Options:

A.

Object is within 5 metres of the vehicle and the sensitivity mode is switched "off", resulting in the yellow LED being lit.

B.

Object is within 5 metres of the vehicle and the sensitivity mode is switched "on", resulting in the yellow LED being lit.

C.

Object is within 5 metres of the vehicle and the sensitivity mode is switched "off", resulting in no LED being lit.

D.

Object is within 5 metres of the vehicle and the sensitivity mode is switched "on", resulting in no LED being lit.

Question 39

Which of the following statements about the shift-left approach is true?

Options:

A.

Shift-left in testing can be implemented only in Agile/DevOps frameworks, as it relies completely on automated testing activities performed within a continuous integration process

B.

Performance testing performed during component testing, is a form of shift-left in testing that avoids planning and executing costly end-to-end testing at the system test level in a production-like environment

C.

Shift-left in testing can be implemented in several ways to find functional defects early in the lifecycle, but it cannot be relied upon to find defects associated with non-functional characteristics

D.

Continuous integration supports shift-left in testing as it can reduce the time between the introduction of a defect and its detection, thereby reducing the cost to fix it

Question 40

Use Scenario 1 “Happy Tomatoes” (from the previous question).

When running test caseTC_59, the actual result fort = 35degrees Celsius isOUTPUT = Xinstead of the expected output.

Which information should NOT be included in the defect report?

Options:

A.

Identification of the test object and test environment

B.

A concise title and a short summary of the defect being reported

C.

Description of the structure of the test team

D.

Expected results and actual results

Question 41

Which of the following statements about the test pyramid is TRUE?

Options:

A.

Each layer of the test pyramid groups tests related to a single non-functional quality charactenstic.

B.

The higher the layer of the test pyramid, the more production code a single automated test within the layer tends to cover

C.

The higher the layer of the test pyramid, the more maintainable a single automated test within the layer tends to be

D.

The higher the layer of the test pyramid, the more isolated a single automated test within the layer tends to be.

Question 42

Mark the correct sentences:

* Defects are a result of environmental conditions and are also referred to as "Failures"

* A human mistake may produce a defect

* A system mil totally fail to operate correctly when a failure exists in it

* When a defect exists in a system it may result in a failure

* Defects occur only as a result of technology changes

Options:

A.

II, IV

B.

I, II

C.

IV, V

D.

II, III, IV

Question 43

Which of the following statements refers to good testing practice to be applied regardless of the chosen software development model?

Options:

A.

Tests should be written in executable format before the code is written and should act as executable specifications that drive coding

B.

Test levels should be defined such that the exit criteria of one level are part of the entry criteria for the next level

C.

Test objectives should be the same for all test levels, although the number of tests designed at various levels can vary significantly

D.

Involvement of testers in work product reviews should occur as early as possible to take advantage of the early testing principle

Question 44

Which ONE of the following options MOST ACCURATELY describesbranch testing?

Options:

A.

In branch testing, the coverage items are executable statements. The aim is to design test cases that exercise statements in the code until an acceptable level of coverage is achieved, expressed as a percentage.

B.

In branch testing, the coverage items are control flow transfers between decisions, and the aim is to design test cases to exercise flow transfers in the code until an acceptable level of coverage is achieved. Coverage is measured as the number of branches exercised by the test cases divided by the total number of branches expressed as a percentage.

C.

In branch testing, the coverage items are branches, and the aim is to design test cases to exercise branches in the code until an acceptable level of coverage is achieved. Coverage is measured as the number of branches exercised by the test cases divided by the total number of branches expressed as a percentage.

D.

In branch testing, the coverage items are executable decisions. The aim is to design test cases that exercise statements in the code until an acceptable level of coverage is achieved. Coverage is expressed as a percentage.

Question 45

The acceptance criteria associated with a user story:

Options:

A.

are often written in a rule-oriented format using the template referred to as "Given/When/Then"

B.

are often documented following in rule-oriented format using the following template: "As a [role], I want [feature], so that I can [benefit]"

C.

can be written in different formats and represent an aspect of a user story referred to as confirmation' of the so called "3 C's"

D.

must be written in one of the two following formats: scenario-oriented or rule-oriented

Question 46

Which ONE of the following options BEST describes black-box test techniques?

Options:

A.

Black-box testing techniques are based on experience with the test object without knowing the internal structure.

B.

In black-box testing techniques, test cases are created based on the software's implementation.

C.

Black-box testing techniques are based on analyzing the test object's specified and implied behavior without knowledge of its internal data structure.

D.

Black-box testing techniques involve analyzing the specified behavior of the test object without knowledge of its internal structure.

Question 47

Which of the following statements about static testing and dynamic testing is true?

Options:

A.

Unlike dynamic testing, which can be also performed manually, static testing cannot be performed without specialized tools

B.

Static testing is usually much less cost-effective than dynamic testing

C.

Unlike dynamic testing, which focuses on detecting potential defects, static testing focuses on detecting failures which may be due to actual defects

D.

Both static testing and dynamic testing can be used to highlight issues associated with non-functional characteristics

Question 48

Which ONE of the following statements about maintenance testing is CORRECT?

Options:

A.

Maintenance testing is performed exclusively for adaptive maintenance.

B.

Maintenance testing is only required when defects are reported in production.

C.

Maintenance testing should be performed when enhancements, fixes, or updates are applied to an existing system.

D.

Maintenance testing does not require test cases since it focuses solely on defect verification.

Question 49

Which of the following best describes the relationship between a test progress report and a test summary report?

Options:

A.

The test report prepared during a test activity may be referred to as a test progress report, while a test report prepared at the end of a test activity may be referred to as a test summary report.

B.

The test report prepared during a test activity may be referred to as a test summary report, while a test report prepared at the end of a test activity may be referred to as a test progress report.

C.

There is no difference between a test progress report and a test summary report.

D.

Both the test progress report and the test summary report should always be generated via an automated tool.

Question 50

Which of the following is not an example of a typical content of a test completion report for a test project?

Options:

A.

The additional effort spent on test execution compared to what was planned

B.

The unexpected test environment downtime that resulted in slower test execution

C.

The residual risk level if a risk-based test approach was adopted

D.

The test procedures of all test cases that have been executed

Question 51

The following diagram displays the logical dependencies between requirements and the individual requirement priorities. For example, "R2->R3" means that R3 is dependent on R2. Priority is indicated by the number next to the letter ”P" i.e. P1 has a higher priority than P2.

Which one of the following options best describes the test execution sequence using both requirement dependency and priority

Options:

A.

R2. R1, R3. R4. R5, R6. R7, R8.

B.

R1, R2, R3, R4, R5, R6, R7, R8.

C.

R2, R4. R8, R5, R1, R6, R3, R7.

D.

. R2, R1,R3,R7,R6,R5,R4,R8.

Question 52

Which of the following statements about retrospectives is TRUE?

Options:

A.

Only developers and testers should be involved in retrospectives, as involving people in other roles is very likely to prevent developers and testers from having open and constructive discussions that really help identify process improvements.

B.

Retrospectives can be very effective in identifying process improvements and can also be very efficient and cost-effective especially since, unlike reviews, they do not require any follow-up activities

C.

On Agile projects, well-conducted retrospectives at the end of each iteration can help the team reduce and sometimes even eliminate the need for dairy stand-up meetings.

D.

During retrospectives, in addition to identifying relevant process improvements, participants should also consider how to implement these improvements and retain them based on the context of the project, such as the software development lifecycle.

Question 53

Which of the following is a typical potential risk of using test automation tools?

Options:

A.

Reduced feedback times regarding software quality compared to manual testing.

B.

Reduced test execution limes compared to manual testing.

C.

Reduced repeatability and consistency of tests compared to manual testing

D.

Underestimation of effort required to maintain test scripts.

Question 54

Which of the following statements is true?

Options:

A.

Functional testing focuses on what the system should do while non-functional testing on the internal structure of the system

B.

Non-functional testing includes testing of both technical and non-technical quality characteristics

C.

Testers who perform functional tests are generally expected to have more technical skills than testers who perform non-functional tests

D.

The test techniques that can be used to design white-box tests are described in the ISO/IEC 25010 standard

Question 55

Which of the following lists factors That contribute to PROJECT risks?

Options:

A.

skill and staff shortages; problems in defining the right requirements, contractual issues.

B.

skill and staff shortages; software does not perform its intended functions; problems in defining the right requirements.

C.

problems in defining the right requirements; contractual issues; poor software quality characteristics.

D.

poor software quality characteristics; software does not perform its intended functions.

Demo: 55 questions
Total 188 questions