AVIXA CTS Certified Technology Specialist Exam Practice Test

Demo: 57 questions
Total 193 questions

Certified Technology Specialist Questions and Answers

Question 1

Which of the following is addressed within the Needs Analysis part of the AV Design process?

Options:

A.

creating the project timeline

B.

outlining project Bill of Materials

C.

identifying key stakeholders for the project

D.

identifying functional requirements of the project

Question 2

When an audio device can no longer accurately reproduce the audio signal, It is called

Options:

A.

feedback.

B.

dithering.

C.

distortion.

D.

saturation.

Question 3

Given this system information:

What is the MINIMUM current requirement (assuming 110VAC electrical supply)?

Options:

A.

15A

B.

25A

C.

30A

D.

50A

Question 4

When doing a site survey, it is MOST IMPORTANT to consider the client's

Options:

A.

budget.

B.

timeline.

C.

expectations.

D.

knowledge of technology.

Question 5

A schedule is being created for a project. Which of these factors will have the MOST impact on the calculations?

Options:

A.

labor hours

B.

inventory

C.

blueprints

D.

cost of materials

Question 6

When calibrating a loudspeaker system, which weight setting on the SPi. meter is used for its mdus>on of low frequency sound levels in the measurement?

Options:

A.

Weighted

B.

Weighted

C.

Weighted

D.

Weighted

Question 7

After installation, the system does not pass audio. Based on the information in the drawing, what is the MOST LIKELY cause?

Options:

A.

cable lengths

B.

system needs a DSP

C.

phantom power is required

D.

speaker requires a 70 V transformer

Question 8

During a site survey, a client states that there will be no acoustical treatment to their new council chamber and they want a voice lifting (reinforcement) system. Which loudspeaker should be recommended to achieve optimal speech intelligibility?

Options:

A.

coaxial loudspeaker

B.

broad beam loudspeaker

C.

narrow beam loudspeaker

D.

ceiling mount loudspeaker

Question 9

The BEST way to ensure that a project is on budget is to

Options:

A.

calculate the number of calendars days remaining to completion.

B.

visit the job site and determine the percentage of work completed.

C.

ask the installation team to estimate remaining work to completion.

D.

review accrued labor and material costs against remaining work.

Question 10

What should be used to clean foam microphone wind screens?

Options:

A.

bleach (lye)

B.

warm water

C.

ethyl alcohol

D.

isopropyl alcohol

Question 11

According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?

Options:

A.

Week 3

B.

Week 4

C.

Activity B

D.

Milestone X

Question 12

When gathering information, it is important to ask about the customer's goals because the

Options:

A.

customer may have unrealistic expectations of what can be done.

B.

customer may be planning on moving before the project is complete.

C.

integrator needs to confirm they understand the relationship between desires and budget

D.

integrator needs an understanding of what the customer expects to beable to do with the space.

Question 13

What should be identified during a project's needs analysis?

Options:

A.

the overall budget

B.

stakeholders involved

C.

the timeline for completion

D.

key activities to be performed

Question 14

While conducting a site survey, it is discovered that a conference room has glass walls, high ceilings, and wooden floors. The BIGGEST challenge for this room would be handling of which of the following?

Options:

A.

feedback

B.

cable paths

C.

reverberance

D.

loudspeaker placement

Question 15

When comparing two products and trying to decide which product to use, what is the FIRST thing that should be reviewed?

Options:

A.

price

B.

product reliability

C.

equipment lead times

D.

product specifications

Question 16

What is the standard impedance of a DMX cable?

Options:

A.

55 Q

B.

75 Q

C.

110 Q

D.

150 Q

Question 17

A client with an open concept office space has stated a concern regarding speech privacy for workers. A possible solution for this issue is a(n)

Options:

A.

sound masking system.

B.

distributed speaker system.

C.

individual audio monitor system.

D.

audio phase cancellation system.

Question 18

What PRIMARY concern should the sales representative have had during the site survey of this room?

Options:

A.

room orientation

B.

length of cable runs

C.

ceiling clearance for the projector lift

D.

combination of fluorescent and Incandescent lighting

Question 19

What section of the color chart is used to calibrate brightness? Select the answer by clicking on the appropriate area of the chart

Options:

Question 20

Noting the position of ventilation ducts is useful when determining

Options:

A.

the best position for the lectern.

B.

the heat gain of the equipment rack.

C.

where a projector can be suspended.

D.

where people can be seated in the room.

Question 21

In sound, amplitude is perceived as

Options:

A.

pitch

B.

tone

C.

loudness

D.

frequency

Question 22

What is the aspect ratio in these images?

Options:

A.

1.33:1

B.

4:3

C.

5:4

D.

16:9

Question 23

As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?

Options:

A.

allows the AV provider toclean, service and assess equipment In the field on a regular basis

B.

allows the AV provider to check in with customer and serves as an opportunity to sell further solutions

C.

allows the AV provider tosell a service that is often forgotten by the customer, and therefore generate greater profit

D.

allows the AV provider access to client premises and scope future work

Question 24

Which section of a program report describes the probable costs of an AV project?

Options:

A.

budget

B.

needs analysis

C.

systems descriptions

D.

infrastructure requirements

Question 25

In order to calculate throw distances for an existing installation, what is the FIRST thing to evaluate?

Options:

A.

aspect ratio

B.

light conditions

C.

the size of the screen

D.

the height of the ceiling

Question 26

The architect states that the project is in the pre-design phase. This would indicate that

Options:

A.

construction is about to commence.

B.

a needs analysis should be requested.

C.

the reflected ceiling plan has been approved.

D.

the control system is ready for implementation.

Question 27

A task cannot begin before another task is completed. How is this described in a project task schedule?

Options:

A.

requirement

B.

dependency

C.

consequence

D.

determination

Question 28

Which of the following protocol allows sources and displays to communicate in order to ensure the display is sent the correct signal?

Options:

A.

ATSC

B.

DVB

C.

EDID

D.

HDCP

Question 29

Which connector is typically used for ease of termination for various signal types?

Options:

A.

B.

Question 30

What are the dimensions of UHD resolution?

Options:

A.

2560 x 1440 pixels

B.

3840 x 2160 pixels

C.

2048 x 1080 pixels

D.

4096 x 2160 pixels

Question 31

Identify the portion of the connector that carries the signal. Select the answer by clicking anywhere on the correct part of the connector.

Options:

Question 32

Which microphone type has a basic cardioid pick up pattern?

Options:

A.

Type(a)

B.

Type(b)

C.

Type(c)

D.

Type(d)

Question 33

Two computers are connected to a videoconferencing system through a switcher using HDMI cables. Computer content from PC A is being properly transmitted. However, when PC B is selected by the switcher, it does not work through the videoconferencing system. They both work when connected directly to the videoconferencing system or the monitor. The solution is to add a device that enables____management.

Options:

A.

DDC

B.

DHCP

C.

HDCP

D.

TMDS

Question 34

Which section of the Ohm's Law chart would you use to calculate watts? Select the coned quadrant.

Options:

Question 35

Which of the following is a MAJOR consideration for implementing AVoIP?

Options:

A.

it requires the use of a fiber backbone

B.

it prohibits virtual architecture rearrangement

C.

it restricts sources from being accessed from anywhere

D.

it requires an understanding of compression, image quality, and latency

Question 36

If content is protected, the HDCP handshake(s) occurs

Options:

A.

every few seconds after the hotplug circuit is first completed.

B.

only when the hotplug circuit is first completed.

C.

only when the display is turned on.

D.

only when the source is turned on.

Question 37

A loud hiss is coming from the audio system. This is MOST LIKELY caused by

Options:

A.

fluorescent lighting.

B.

poor gain structure.

C.

phase cancellation issues.

D.

the microphones being off.

Question 38

Which of the following is an example of PPE?

Options:

A.

fiberglass ladder

B.

high visibility vest

C.

virtual reality headset

D.

company branded polo

Question 39

The AV Project Manager is responsible for

Options:

A.

schedule, budget, scope.

B.

design, schedule, configuration.

C.

budget, installation, maintenance.

D.

configuration, scope, maintenance.

Question 40

Every item in a room has some acoustic absorption or reflection characteristics. The level of sound absorbed is MOST affected by

Options:

A.

distance from the sound source.

B.

ambient sound in the system location.

C.

relative loudness of the source material.

D.

frequency and direction of the source.

Question 41

The owner is looking for an audio solution for staff meetings. Which question is MOST important to ask to ensure a functioning system?

Options:

A.

Are there any remote participants?

B.

Will you use displays or a projector?

C.

Do you want handheld or lapel mics?

D.

Would you like ceiling or surface mount speakers?

Question 42

The limits of the vertical visual field indicate that displays should be positioned where in relation to the viewers' standard line of sight?

Options:

A.

center of the image is precisely on-axis

B.

center of the image is at least 10 degrees above

C.

top of the image is no more than 30 degrees above

D.

bottom of the image is no more than 30 degrees below

Question 43

Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

Options:

A.

300 cubic ft (8.5 m3)

B.

600 cubic ft (17 m3)

C.

1500 cubic ft (42.5 m3) o

D.

6000 cubic ft (162 m3)

Question 44

The best practice for tagging AV equipment for inventory management is to

Options:

A.

only tag Items over $99.00 in value.

B.

use a unique identifier for each item.

C.

include the value of each item on the tag.

D.

label all Items of the same model with a common identifier.

Question 45

Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?

Options:

A.

request for quote

B.

request for proposal

C.

contract documents

D.

bid packet (response)

Question 46

A saeen is 144 in (3658 mm) wide and the throw ratio is 2.3:1. How far from the screen should the projector be placed?

Options:

A.

288 In (7303 mm)

B.

302 in (7681 mm)

C.

331 in (8413 mm)

D.

446 in (11339 mm)

Question 47

During the site survey, the client indicates that the space that will become a rear projection room is currently an off-white color. What should be recommended to the client?

Options:

A.

paint the room gray

B.

paint the room black

C.

leave the room as it is

D.

use carpeting on the walls

Question 48

What is the PRIMARY advantage of preventive maintenance?

Options:

A.

upfront costs

B.

system fail proof

C.

less equipment downtime

D.

better system performance

Question 49

A client setting terms for "tire protection of existing conditions" would most likely apply to which of tire following project types?

Options:

A.

New construction

B.

A technology refresh

C.

A prefabricated building

D.

Expansion of an existing building

Question 50

Which document is used to clarify a project design issue?

Options:

A.

change order

B.

progress report

C.

request for change

D.

request for Information

Question 51

When selling rental or staging services, which is the MOST effective way to showcase a company's services and expertise?

Options:

A.

Invite the client to a similar event.

B.

Provide videos of a similar event for the client.

C.

Present photos and drawings of similar events.

D.

Organize brochures and data sheets for all proposed equipment.

Question 52

A customer wants to set up a new digital classroom and has approached the integrator for a quote. What is the BEST way to understand the customer's needs before creating the quote?

Options:

A.

invite the customer to similar installs

B.

inform the customer of new technologies

C.

invite the customer to the office for a meeting

D.

have a manufacturer representative visit the customer

Question 53

The MAIN benefit of an inventory tracking system in an AV rental and staging business is having an accurate record of

Options:

A.

customers contact details.

B.

current resale value of assets.

C.

current state and commitments of assets.

D.

customer’s budgets and spending history.

Question 54

A personnel change at an AV integration company results in the assignment of a new technician to an existing facility.

What is the best FIRST step for the integrator to make the transition?

Options:

A.

Give the technician directions to the site.

B.

Call the client and tell them a new technician has been assigned.

C.

Have the newly assigned technician review the project documentation.

D.

Make an appointment with the client to introduce the new technician to the client.

Question 55

Which section of the Ohm's Law chart should be used to calculate values expressed in Ohms? Select the answer by clicking anywhere within the correct quadrant.

Options:

Question 56

Your client has requested a 50inch monitor be mounted on the south wail of this boardroom. Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on?

Options:

A.

A

B.

B.

C.

C

D.

D

Question 57

Owner standards and design manuals are examples of which kind of documentation?

Options:

A.

vendor

B.

technical

C.

architectural

D.

existing conditions